VZR.235900.000 IG
Cube С-04 Turnstile
Installation Guidelines
13
Figure 6 – Turnstile’s installation dimensions
4.2.4
Figure 6 – wire the cable through the hole (1) in the bottom plate
of the turnstile stands.
4.2.5
Route the RC panel’s cable, PSU’s cable, and, where provided,
AMCS and SAFAS’ cables in the cable conduit or cable channel.
4.2.6
Install the turnstile on the prepared platform.
4.2.7
Pull the RC panel and PSU cables, and, where necessary, AMCS
and SAFAS cables into turnstile housing.
Fix the cables using cable ties.
1 – cable input holes
6 holes