
NEOxl 80 Spare Chassis Replacement Instructions
10400904
©2019 Overland-Tandberg
Page 6 of 8
Move Controller, Fan Assembly, & Drive
Power Board
Located at the upper right of the rear panel are a controller
card and a fan assembly. If tape drives are installed, a drive
power board is located behind the fan.
1.
At the
old
module, loosen the
two blue thumbscrews
and slowly remove the controller from the module, setting
it on an ESD surface.
2.
Loosen the
two blue thumbscrews
and slowly remove
the fan assembly, setting it on an ESD surface.
3.
If present, move the
drive power board
:
a.
Push down the drive power board
latch
to release it.
b.
Slowly slide the
drive power board
out of the module.
c.
At the
new
module, position the drive power board onto
the
alignment rails
.
d.
Slide the
drive power board
in until seated firmly.
e.
Push the board
latch
up until it snaps into place.
4.
Position the
fan assembly
on the alignment rails, slide it
in until it is flush with the rear panel
, and
finger-tighten
the
thumbscrews
to secure it
.
5.
Position the
controller
on the alignment rails, slide it in
until it is flush with the rear panel
, and
finger-tighten the
thumbscrews
to secure it
.
Move Covers
If any tape drives were removed from the old module, the same
drive bay covers from the new module need to be removed and
installed on the old module covering all the now empty tape
drive bays.
NOTE: The bottom bay of a Base Module doesn’t have a cover.
If a second power supply was present and the cover removed
from the new module, install it on the old module.
Insert Module in Rack
WARNING:
To avoid injury, it is recommended that a
mechanical lifter (or at least two people) be used for rack
installation or removal.
WARNUNG:
Um Verletzungen zu vermeiden, empfehlen wir zur
Rack-Installation oder -Deinstallation die Nutzung einer
mechanischen Hebehilfe (oder mindestens zwei Personen).
AVERTISSEMENT:
Afin d’éviter des blessures pendant
l’installation, il est recommande d’utiliser un monte-charge (ou
au moins deux personnes) pour élever ou aligner l’module.
1.
Slide out the
middle
slide rails on both sides.
2.
Using the mechanical lifter, position the
module
in front
of the rack.
3.
Insert the library
inner rails
into the middle rails and
slide the module into the rack.
4.
Tighten the
captive screws
on the bottom of the library
flanges to secure it.
Controller