background image

37

2. TAKING CARE OF THE STRUCTURE OF THE POOL 

- The wood 

Wood is a living substance which is subject to variations in humidity and temperature. Over the course of time wood is liable to swell, tiny cracks or splits 
may appear. Such occurrences do not in any way alter the wood’s resistance or the durability of our materials.
Furthermore, a deformity in the sides of the pool caused by the pressure of the water may occur, mainly on the central and lower planks (under maximum 
water pressure) – this is normal.
On the understanding that the pool has been assembled according to the instructions provided, there is no cause for concern here regarding the stability 
of the structure.
The sterilising high pressure steam treatment of all the timber parts protects the wood from being attacked by insects and fungi. This treatment gives the 
timber a greenish hue which does not pose any danger to humans. At any rate, this colour will fade with time. According to how much it is exposed to 
direct sunlight, the wood will gradually take on a silvery grey appearance.  This process can be slowed down by using a glaze or protective oil, which 
ideally should be applied a few weeks after the swimming pool has been installed (this will stabilise the structure and reduce the greenish tinge caused by 
the steam treatment…).

- The liner 

The liner is a flexible PVC membrane and is exceptionally fragile. Therefore make sure that the water in the swimming  pool is absolutely clean and that the 
pH level is not too high.
-   The surface of the water is the most exposed to a variety of deposits so it must be cleaned regularly with the appropriate products ( no solvents and no 

abrasives should be used).

-   Never put any undiluted treatment product directly on to the liner as this may cause discoloration. The solid blocks of these products must be dissolved in 

a chlorine diffuser or ion the skimmer basket.

-   When you pause the filtration system, particularly in winter, it is essential to treat the pool to prevent the build up of moss and calcium.

i

  

Never completely drain the pool. You must never allow the liner to be left for more than 24 hours without 

water in the pool otherwise it may change shape, cracks may appear, etc.

Stains on the liner: causes and solutions 

COLORS OF 

THE SPOTS

POSSIBLE CAUSES

WHAT SHOULD YOU DO

White

1. Discoloration of the material due to contact 

with a chemical (chlorine…)

1. No solution

White /grey

1. Calcium deposits

1. Drain the pool, have it cleaned by machine, refill the basin, get the water balance right and put in an 

anti-calcium treatment.

Pink 

1. Migration of bacteria which have developed 

underneath the membrane as a result of an 

underlying humidity

1) Lower the pH level and the temperature of the water. Carry out a high- power cleaning treatment and 

run the filter for 48 hours non-stop. To prevent this recurring keep the pH level between 7 and 7.4

Green

1. Algae 

2.accelerated deterioration of the surface of the 

water due to sun and oxidising products

1.Correct the pH level, Carry out a high- power cleaning treatment and run the filter for 48 hours non-

stop, have the pool cleaned by machine.

2. Use a descaler, brush the stains then vacuum the deposits. 

Orange/brown

1. Dead algae

2. Water contains iron oxide or copper

1. Brush the sides of the pool and vacuum the deposits.

2. Lower the pH level and the temperature of the water, brush the stains then vacuum the deposits.

Black

1. Migration of bacteria which have developed 

underneath the membrane as a result of an 

underlying humidity 2. Water contains heavy 

metals (iron, silver …)

1.Lower the pH level and the temperature of the water. Carry out a high- power cleaning treatment and 

run the filter for 48 hours non-stop. To prevent this recurring keep the pH level between 6.8 and 7.0

2. Lower the pH level and the temperature of the water, brush the stains then vacuum the deposits

Liner is sticky 

or has grease 

deposits

1. Algae

2. Water contains heavy metals (iron, silver …)

1.Correct the pH level, Carry out a high- power cleaning treatment and run the filter for 48 hours 

non-stop, have the pool cleaned by machine.

2. . Lower the pH level and the temperature of the water, brush the stains then vacuum the deposits

3. WINTER CARE AND SAFETY

Winter care is an essential element of maintaining the pool. The aim of this operation is to avoid the build up of too many algae and calcium deposits 
inside the basin during the winter. By adding a winter care product you will be protecting the water and your pool in winter, thus making it easier to clean 
at the start of the new season.

i

 

 

It is imperative that you do not completely drain the pool in the winter (or for a long period of time). In fact totally 

draining the pool does not improve the condition either of the liner or of the structure of the basin, since the water 

plays a dual role, providing thermal insulation and ballast. The pool is better protected from weather hasards, the 

water pressure prevents anything going through the sides of the pool (in case of ground movement) and offsets the 

pressure of soil and groundwater.

Details about winter care of the filter are given in the notes provided with the tank. 
It is a good idea to remove the ladder and put it away in a safe place. For safety reasons, this ladder must only be used for accessing the pool. You should 
cover the swimming pool with a winter canvas cover or better still a tarpaulin safety cover certified according to safety standard NF P 90 308. In this case 
you will have to remove any snow from the cover regularly. But having a cover over the pool does not mean that you do not need to be vigilant. You will 
have to check the state of the water regularly and if the water is turning green you will have to treat it using a chlorine solution. 
Finally, make sure that rainwater can drain away properly around the pool.
 

4. DISMANTLING THE POOL

Whilst it is possible to do so, dismantling the pool is not recommended. In fact, it may cause damage to the component parts and repositioning the liner 
when reassembling the pool is a very delicate operation.

Summary of Contents for ubbink Azura 250x450-H126 cm

Page 1: ...671 673 E Mail verkoop outsideliving com Export Outside Living Industries Nederland B V Postbus 15 NL 1800 AA Alkmaar Berenkoog 87 NL 1822 BN Alkmaar Tel Sales 0031 0 72 5 671 661 Tel 0031 0 72 5 671...

Page 2: ...By Notice de montage Montageanleitung Opbouwinstructie Note of assembly Prospecto de montaje Avviso di montaggio 250x450 H126 cm PISCINES ZWEMBADEN POOLS SWIMMING POOLS PISCINAS PISCINE...

Page 3: ...exemple en page 8 N de s rie de la structure N de s rie de la structure N de s rie de la structure N de s rie de la structure N de s rie de la structure N de s rie de la structure N de s rie du liner...

Page 4: ...gtes Betreten Ihres Schwimmbades zu verhindern Bitte lassen Sie im unbeaufsichtigten Becken oder in der unmittelbaren N he kein Spielzeug zur ck Halten Sie das Wasser bitte dauerhaft klar und rein Bit...

Page 5: ...children do not allow running or boisterous games around the edges of the pool do not allow any child who is not a strong swimmer and is unaccompanied to get into the pool without a life jacket on it...

Page 6: ...e in acqua imparate le azioni di salvataggio e soprattutto quelle specifiche per i bambini vietate i tuffi o i salti in presenza di bambini piccoli vietate la corsa e i giochi vivaci ai bordi della pi...

Page 7: ...socle de pompe couvercle de pr filtre embout cannel utilisation de la pompe sec d terioration de la pompe due son immersion innondation du local technique par exemple la d terioration due au gel SONT...

Page 8: ...asure microporeuse compatible avec le traitement autoclave pour pr server sa couleur d origine si vous le souhaitez Stockage et montage de votre piscine Si vous ne souhaitez pas monter votre piscine i...

Page 9: ...arantie Ticket de caisse preuve d achat Photo de la pi ce abim e ou du probl me rencontr Bon de garantie ci dessous d ment compl t N de s rie Magasin Client Ville Adresse Contact Ville T l Direct T l...

Page 10: ...re de limons pour chelle bois H120 130 1 PM 7514114 Pi ce martyre 45x135x280 mm 2 7514149 Sac de sable 25 Kg 2 R 7514016 Rails d accrochage Hung 2 06 ml 6 PRG 7514889 Profile de renfort Galvanis 2 PS1...

Page 11: ...5 1335 1401 5 4138 5500 4658 4658 250x450 H126 cm 20 cm 250 cm 450 cm Dalle B ton Ep 200 mm Bodenplatte 200 mm stark betonnen Dikte 200 mm Betonnen fundering Thickness 200 mm hormig n Espesor 200 mm...

Page 12: ...orische Sicherheitsvorrichtung Plane Alarm Absperrung Halfingebouwde installatie op betonnen bodemplaat LET OP veiligheidsvoorziening verplicht afdekzeil alarm hek Half buried installation on concrete...

Page 13: ...in HDPE 4 Lastra in calcestruzzo sotto la piscina 7504635 Principe de la piscine Enterr e ou semi enterr e Avant de d buter le montage assurez vous que vous disposez bien de l ensemble des pi ces IMPO...

Page 14: ...ermet d viter l crasement des rainures du bois c est pourquoi on l appelle pi ce martyre Sie finden in Ihrem Frachtst ck ein St ck Holz von etwa 30 cm L nge das zwischen Hammer und den Bohlen Ihres Be...

Page 15: ...liner D coupe buse et skimmer Installation margelles sapin Echelles 4a Mettre en place le feutre de protection pour le sol 4b D couper le feutre de protection l aide d un cutter ou d une paire de cise...

Page 16: ...anschlie end etwa alle 20 cm 3f Schrauben Sie die erste Schiene der Schwimmabdfolie mit den Edelstahlschrauben 4x40 fest 3g An den Ecken die Schiene V f rmig so einschneiden dass das Profil geknickt...

Page 17: ...oor dat alles goed vastzit 3e Boor de benodigde gaten in de strips 3 cm van de uiteinden en vervolgens om de ca 20 cm 3f Schroef de eerste foliestrip vast met behulp van de rvs 4x40 schroeven 3g Zaag...

Page 18: ...ding to the measurements 3 cm from the ends and then approximately every 20 cm 3f Screw in the first length of track for the liner using 4x40 stainless steel screws 3g At the corners partially cut a V...

Page 19: ...les seg n las dimensiones a 3 cm de los extremos y luego cada 20 cm aproximadamente 3f Atornillar el primer riel del revestimiento con tornillos inoxidables de 4x40 3g Al nivel de los ngulos corte par...

Page 20: ...assicurandone la buona aderenza 3e Forare le rotaie 3 cm dalle estremit poi tutti i 20 cm circa 3f Avvitare la prima rotaia del rivestimento con le viti inox 4x40 3g Al livello degli angoli tagliare i...

Page 21: ...20 1 Montage paroi Montage der Seitenw nde Opbouw van de wanden Erecting the sides of the pool Montaje de la pared Montaggio delle pareti J 1b 1c J 1c 1a PS1 8x PS1 PS1 PS1 PS1 P S 1 P S 1 P S 1 P S 1...

Page 22: ...A B Het is noodzakelijk de uitlijning van de keggen kalklijn en diagonalen snoer van 10 meter te controle ren A B To imperatively check alignment of wedges chalk line and diagonals 10 m ribbon A B Con...

Page 23: ...22 150 360 360 360 150 2 cm 1h 1i PF PERCAGE DES TROUS et FIXATION DES SABOTS 1g P P...

Page 24: ...wing number Berenkoog 87 NL 1822BN Alkmaar Tel 31 0 725671671 E mail info ubbinkgarden com internet www ubbinkgarden com drawn by approved rev American proj qty nr title desciption material client sca...

Page 25: ...2e 170 mm 230 mm 6 x 90 x2 3 Pr paration des parois Vorbereitung der Seitenw nde Voorbereiden van de wanden Preparing the sides of the pool Preparaci n de las paredes Preparazione delle pareti 3a 3b...

Page 26: ...25 3 mm OK NO 3e C 3f 3g...

Page 27: ...re et liner Installation von Vlies und Schwimmbadfolie Aanbrengen van vilt en folie Installing the felt underlay and the liner Instalaci n del fieltro y del revestimiento Installazione del feltro e de...

Page 28: ...Skimmers Uitsnijden van instroomopening en skimmer Cutting the liner and fitting the backwash inlet nozzle and the skimmer Recorte para tobera y skimmer Taglio per condotto e skimmer 5a 5b 5c 5h 5i 5...

Page 29: ...pins Installation der Randplatten aus Kiefernholz Aanbrengen van de zwembadrand uit vurenhout Installing pine coping Instalaci n de bordes de pino Installazione dei bordiin abete DMP 6c 70 cm DMP 6a...

Page 30: ...29 7 Echelles Leitern Trappen The ladders Escaleras Scale 7a 7b MARGELLE RENFORT VERST RKUNGSRANDPLATTE BOVENRAND VERSTERKINGSRAND BORDE DE REFUERZO BORDO RINFORZO 7c L 7d N 7e 7f 7g...

Page 31: ...ux qui doivent tre utilis s et stock s exclusivement selon les indications des fabricants Ne pas m langer les produits chimiques entre eux Entreposer les produits emballages bien ferm s dans un local...

Page 32: ...1 pr sence d algues 2 vieillissement acc l r de la ligne d eau sous l influence du soleil et des produits oxydants 1 corriger le pH faire un traitement choc et filtrer en continu pendant 48H faire un...

Page 33: ...miteinander vermischen Die Chemikalien in gut verschlossenen Verpackungen an einem k hlen und bel fteten Raum lagern sie nicht dem direkten Sonnenlicht aussetzen Falls ein Beh lter f r die Dosierunge...

Page 34: ...eln 1 den pH Wert korrigieren eine Schockbehandlung durchf hren und w hrend 48 h fortlaufend filtern eine maschinelle Reinigung durchf hren 2 ein Entkalkungsmittel einf hren und die Flecken abb rsten...

Page 35: ...ikt en opgeslagen Meng chemische producten niet met elkaar Sla de producten in gesloten verpakking op in een koele en voldoende geventileerde ruimte Stel ze niet aan direct zonlicht bloot Als u een ko...

Page 36: ...pas een shock chlorering toe laat het filter continu lopen gedurende 48 uur en voer een mechanische schoonmaak uit 2 pas een anti aanslagmiddel toe verwijder de vlekken met een borstel en zuig de aans...

Page 37: ...se are dangerous products that must be stored and used only as directed by the manufacturers Do not mix chemical products with each other Store products in tightly closed containers in a cool and well...

Page 38: ...face of the water due to sun and oxidising products 1 Correct the pH level Carry out a high power cleaning treatment and run the filter for 48 hours non stop have the pool cleaned by machine 2 Use a d...

Page 39: ...ones de los fabricantes respectivos y no deben mezclarse con otros productos qu micos Almacene los productos en envases herm ticamente cerrados en un lugar fresco y ventilado y no los exponga a la luz...

Page 40: ...entre 7 y 7 4 Verdes 1 presencia de algas 2 envejecimiento acelerado de la superficie del agua debido al sol o a los productos oxidantes 1 corregir el pH hacer un tratamiento intensivo y filtrar cont...

Page 41: ...do le indicazioni dei produttori Non mischiare tra di loro i prodotti chimici Depositare i prodotti con gli imballaggi ben chiusi in un locale fresco a areato e non esporli alla luce diretta del sole...

Page 42: ...della linea d acqua sotto l influsso del sole e dei prodotti ossidanti 1 correggere il pH fare un trattamento drastico e filtrare di continuo per 48 ore effettuare una pulizia meccanica 2 passare un...

Page 43: ...42 NOTES...

Page 44: ...43 N h sitez pas nous envoyer la photo de votre piscine contact outsideliving com...

Reviews: