Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 7
Important:
Do not screw wall panels to floor until
Step 28.
While panels should be positioned on
floor so 2x3 bottom framing of wall is flush with floor while wall siding overhangs floor.
16.
Lift and place 2nd Tall Wall Side Solid
Wall Panel on floor.
Wall flush
at front.
15.
Place a second Solid Wall Panel in the corner positioning the wall framing flush on plywood floor.
Note, the rear walls (and front walls) will be sandwiches between the side walls. Line Wall Studs together
and attach with 3 - 2.5” screws at bottom, middle and top. Have helper hold panels while being secured.
Tall
Wall
Side
17.
Position and attach 2nd side wall panel to existing sidewall. Secure vertical studs
together with 3 - 2.5” screws. 2x3 wall framing of panel will sit flush with plywood.
Rear
Rear
W
all
Tall Wall
Side
Rear
Wall
View of Rear Corner showing Tall Wall Side
and Rear Wall orientation. Note how the Tall
Wall 2x3 bottom framing is flush to floor
while wall panel siding overhangs floor.
2.5” screws from
rear vertical stud
into Tall Wall
Side vertical
stud.
Front