31.
When all walls are attached together, check alignment with the
floor. Bottom wall framing should sit flush with outside of floor joists
and plywood floor. When positioned correctly, fasten bottom wall
plates to floor using 4-2.5” screws per wall panel.
Important-
If walls are not lining up and appear higher or lower to each
other, your floor may not be LEVEL, please check the level of your floor. You
may need to make slight adjustments to level your floor before proceeding.
33.
. When Gable wall is positioned correctly, attach to walls and top plate with 6 - 2” screws. Screw
from the bottom of gable framing down into Top Plate and Wall. Complete remaining Gable Wall.
Straight
Edge
Gable Wall
32.
Lift up
Gable Wall
and place on top of rear wall. Once again, gable with 33 3/4” degree cut will be
aligned on high wall side. Slide Gable Wall side to side and use a straight edge to line up angled framing of
gable with Top Plates and Wall. There is some tolerance, try for best fit on both sides.
6- 2” screws
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
30.
Attach
Horizontal Wall
Extendor Brace
to Framing of
Top and Bottom walls. Start with
High Wall Side and attach 60” and
26” long pieces with 10 - 1 1/2” for
side. Pieces should be flush with
top of Extendor Wall Framing.
Alternate screws into both pieces
of framing. Complete Front and
Rear walls (60” and 30” l pieces).
60” Long
Gable Trim
attached in
Step 63
.