98.
Attach Interior
Vertical Door Stops
to door framing from inside of shed. Use 4 - 2”
screws to secure each Stop. Stops should overlap door by approx. 1/2”
Door Stops
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 32
96.
Place 3rd Ridge Cap 8” back from 2nd. (enough to cover shingle nails). Attach 3rd Ridge Cap down
as per
Step 95
. Continue to position and attach Ridge Caps until half roof is complete.
8”
8”
97.
From opposite side, position and attach Ridge Caps as described above. Score/cut 1 Ridge
Cap to 12” or to fit in the center of roof. Attach center cap with 4 - 1 1/2” Shingle Nails.