1.
Lay out
Large Floor Joist Frame and 2 Floor Joists
as illustrated above. Position Joists
equally in Floor Joist Frame. Use
Small Floor Joist Frame
as a template to determine joist position.
Position Joist so flush with framing.
Flush
with
framing
2.
When correctly positioned, attach each Joist with 4 - 2 1/2” screws (2 per end).
You can find
the Square Drive Screw Bit in the Hardware Kit Bag.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 4
You can find the
Square Drive Bit for
the screws in with
the Hardware Kit
Bag.
A. Floor Section
Plywood Floor
Large (3)
Floor Joist
Frames
Large (3)
Floor Runners (10)
Plywood Floor
Small (3)
Exploded view of all parts necessary to complete
Floor Section. Identify all parts prior to starting.
Note, Floor Footprint is 96” wide x 136 1/2” deep.
Concrete Pad
(optional foundation method)
Floor Joist
Frames
Small (3)