Making British gardens great
SHED BASE
INSTRUCTIONS
ISSUE: 0219
FIXING PACK CODE:
SBPMFP
Tape
Measure
We recommend using the following tools (
NOT SUPPLIED
):
Pozidrive
Screwdriver
Drill & 2mm
Drill Bit
Spirit Level
400mm
5’
3’
400mm
4’
3’
527.3mm
3’
6’
546mm
4’
6’
471.5mm
5’
7’
471.5mm
7’
7’
397.75mm
8’
6’
Start at the corners.
Pre-drill and screw
through the face of the one timber part into
the end of the other.
Use the section layouts
below for guidance on positioning.
Repeat this process for the opposite corners
to form the overall outer frame. Ensure that all
edges and faces of the timber parts are flush.
Measure where the central timber part(s) will
be placed. Use the measurements from the
section layout below for your chosen shed
base.
Mark, pre-drill and screw them into
place.
1
2
3
Missing Something?
Call our aftersales team on
0333 777 7089
Need more information?
Call our technical team on
0333 321 3142
Visit our website for spare
instructions and more
information
www.forestgarden.co.uk
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
5 x
90mm
Scr
ews
QTY
: 20
FIXING PACK CONTAINS:
SECTION LAYOUTS
Identify your chosen shed base to follow the correct construction and
measurements provided:
INSTRUCTIONS
PLEASE KEEP PLASTIC BAGS AND
SMALL PARTS AWAY FROM CHILDREN
REMINDER
Always pre-drill
before screwing.
SBP43M
SBP53M
SBP63M
SBP64M
SBP75M
SBP77M
SBP86M
It’s vital that you build your new shed base on
level ground in your
desired location.
Indicates the timber
orientation during
construction. This will apply to
all of the corners for your base.