Outside Panel
Middle Panel
Outside Panel
53.
Make sure to attach Roof Panels
down to Rafters as shown above
.
52.
Position and attach Front Roof Panels
as per
Steps 48-51.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 22
54.
Roof
Filler Shingles
are included to cover
roof seams. Starting at the bottom, slide the first
Long Shingle in until flush with other bottom
shingles.
DO NOT ATTACH UNTIL STEP 55.
55.
Screw first filler shingle down to rafters
using 1 - 2 1/2” screw per panel (2 in total).
Make sure to screw into both rafter.
Attach above the
exposure line.
Exposure Line
56.
Slide in another filler shingle and attach as per
Step 55.
On your last row of shingles, the filler
shingle is precut to fit properly. Attach to roof with 2 - 1 1/4” Shingle nails per shingle. Position 2
Simpson Strong ties on battens and outside rafters and secure 4 - 1 1/4” screws. 8 ties in total.
4- 90 degree Simpson
Ties / Gable.