79.
Assemble
Flower Box Kit
with Assembly
Instructions found in each Flower Box Kit.
Position completed Flower Box below bottom of
window trim and secure with 2 - 2” screws per
box. Screw from inside of box into the center
wall stud. Attach second screw 2” underneath
first screw and once again into the wall stud.
76.
Position and attach
Vertical Door Flange
on inside door frame
(left door from outside)
using 6 - 2” screws. Position on inside edge of door frame.
78.
Attach Door Handles and Black Barrel Bolt as
illustrated above with 3/4” Black Screws. Note how
female part of Barrel Bolt is positioned higher than
male. Do a dry run first to position Barrel Bolt
correctly.
Important
- Drill pilot holes with 1/8” drill bit
prior to securing with screws to prevent wood
splitting.
Inside Edge of
Door Frame
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 30
77.
The
Interior Cane Bolt
will be attached to Vertical Door Flange. To
position Cane Bolt correctly, attach to flange first, close doors and mark
hole to house Cane Bolt Rod. Open doors and drill hole where previously
marked with 1/2” bit. Use hardware provided in each kit to complete
installation of all hardware.
Drill 1/2” Diameter Hole
to accommodate rod of
Cane Bolt.