8.1 Installing the unit into 2" observation wells,
top cap with cut-out
Required accessories: 2" OTT top cap with cut-out
How to install the OTT ecoLog 500 (3G)
Preliminary work: If not already done, install batteries and SIM card,
refer to Chapter 5.
Open the top cap.
Determine the current depth using a contact gauge and note the measured
value.
Insert the pressure probe into the observation well.
Slowly
and
carefully
lower the pressure probe by means of the pressure
probe cable!
Insert the communication unit into the observation well until the upper part of
the communication unit is fully seated on the top cap, refer to Fig. 9.
Set the operating parameters, refer to Chapter 9.
Close the top cap.
Universal suspension bracket
1
Fig. 8: Accessories for installation – Part 2
1 = drilled hole for OTT ecoLog 500 (3G)
Communication unit
OTT top cap
Infrared interface
2" observation well
Fig. 9: Installing the OTT ecoLog 500 (3G)
into a 2" observation well.
20
Summary of Contents for ecoLog 500
Page 1: ...Operating instructions Groundwater Datalogger OTT ecoLog 500 OTT ecoLog 500 3G English...
Page 53: ......
Page 54: ......
Page 55: ......