SECTION 3 - CHASSIS & TURNTABLE
3-56
– JLG Lift –
3120740
12.
The Cover (6) is now installed on this assembly. Taking
care to correctly align Pipe Plug hole (20) with those in
the Hub (1J), usually 90° to one another.
Locate the 4 counterbore holes in Hub (1G) [marked in
Step 3] and install 4 Shoulder Bolts (13). A slight tap with
a hammer may be necessary to align Shoulder Bolt with
Hub (1G) counterbore.
13.
Install regular Grade 8 Bolts (12) into remaining holes.
14.
Pipe Plugs (20) are to be installed into Cover (6) using a
lubricant seal of some sort.
15.
Torque Shoulder Bolts (13) to 23-27 ft.-lbs. and regular
Grade 8 Bolts (12) to 23-27 ft.– lbs.
16.
The unit must be completely filled with EP 90 lubricant
before operation.
Hub Shaft Sub-Assembly
1.
Press Bearing Cone (1D) onto Shaft (1A).
2.
Press Bearing Cup (1C) into Hub (1G) taking care to
insure cup start square with the bore of Hub (1G).
Go to
Discount-Equipment.com
to
order your
parts