39
English language
Use and maintenance
INFORMATION FOR USE
6
To extract the pile proceed as outlined below.
1) Start the machine (see “Starting the engine”).
2) Move the levers (W) to shift the machine to the pile driving point.
3) Place the column in a perfectly vertical position.
- To manually position the column in vertical position use the levers (F) and (G).
- Check the verticality using the level gauge (S).
- To automatically place the column in vertical position see “Using the verticality sys-
tem”.
- Move the lever (T) and the lever (U) to position the percussion hammer right on the
driving point.
4) Move the lever (H) and lower the jack (L) to the ground to counter the force applied for
the extraction.
Caution - Care
On loose ground place a plate (M) of a suitable size between the ground and the foot
of the outrigger to increase the resting surface area.
The outrigger foot must rest on the ground applying a light pressure but not lifting
the machine.
5) Move the lever (N) to lower the percussion hammer until the clamp is positioned on
the end of the hammer.
6) Lock the grip of the clamp on the pile using the lever (P).
7) Move the lever (N) (position “N2”) to slowly lift the percussion hammer until the clamp
is tensioned.
8) When the clamp is tensioned move the lever (Q) to position (Q1) and then move the
lever (N) to position (N2).
9) Move the lever (Q) to position (Q0) to stop the percussion when the pile has been
extracted from the ground and move the lever (N) to stop the lifting of the percussion
hammer.
10) Tilt the pile and move lever (N) to activate the lowering of the hammer until the pile is
on the ground.
11) Move the lever (P) to open the jaws of the clamp and remove the pile.
12) Move the lever (H) to lift the jack (L) from the ground.
13) Remove the clamp at the end of the pile extraction work.
Removing the pile extraction clamp
To remove the pile extraction clamp carry out the fitting operations described above in
reverse order.
Pile extraction clamp maintenance
For maintenance operations refer to the manual of the manufacturer of the pile extraction
clamp.
Summary of Contents for IIa Series
Page 2: ......
Page 6: ......
Page 84: ...78 ENCLOSURES A English language Use and maintenance...
Page 85: ...79 ENCLOSURES A English language Use and maintenance...
Page 86: ...80 ENCLOSURES A English language Use and maintenance...
Page 87: ...81 ENCLOSURES A English language Use and maintenance...
Page 88: ...82 ENCLOSURES A English language Use and maintenance...
Page 89: ...83 ENCLOSURES A English language Use and maintenance...
Page 90: ...84 ENCLOSURES A English language Use and maintenance...
Page 91: ...85 ENCLOSURES A English language Use and maintenance...
Page 92: ...86 ENCLOSURES A English language Use and maintenance...
Page 114: ...108 ENCLOSURES A English language Use and maintenance...