CLOSED LOOP PIPING

 

y

All pipes starting from and resulting to collectors must by appropriately insulated in order to resist to temperatures 

from -30°C to +120°C. It is also necessary to protect insulating material from UV rays.

 

y

The thickness of insulation depends on the local climate conditions.

 

y

To minimize heat losses, the distance between collectors and the boiler heat exchanger must be the smallest 

possible. 

 

y

Avoid the concentration of air. If this is not possible, the installation of an automatic ventilator at the air accumulation 

point. concentration is necessary. 

 

y

Pipes diameter must be from Ø18mm to Ø22mm for distances up to 20 meters and Ø15mm for distances up to 

12 meters.

 

y

All the union nuts must resist compression 6 bar and temperatures from -30°C to +200°C. 

 

y

The annual check of the equipment and its connections is mandatory. 

POST INSTALLATION INSTRUCTIONS

Before using the system make a final check. Open all the valves and check for any kind of leakage. Repeat the 

inspection after 30 minutes. Check if the system is filled with water and antifreeze fluid according to the company’s 

instructions. In case of any failure condition a specialized technician should be called in.

A basic periodic maintenance will assure the long life and high efficiency of the solar installation.

 

y

It is recommended that the appliance is inspected in situ according to the instructions stated in the guarantee 

twice a year and checked for possible damage (breaking) of the collectors’ glass, leaks in the connecting piping to 

the mains and to the consumption system, inspection of the pipe insulation and cleaning of the glass.

 

y

If the collectors’ glass is broken, it should be replaced immediately.

 

y

It is recommended that the glass is washed at an hour of low sunlight to avoid damages due to expansion-

contraction, due to temperature changes.

 

y

 If the fittings are worn (screws, pugs, piping, etc), these should be replaced at the owner’s cost. 

 

y

The level of antifreeze in the closed circuit must be checked annually (as it could need toping up), to ensure the 

efficient operation.

 

y

In cases where there is to be no use of hot water for long periods of time (e.g. during the summer holidays), it is 

recommended that the collector surface is covered with an opaque cover in order to avoid the building up of high 

temperatures.

ATTENTION!

 Place taps with thermostatic regulation up to 38°C for hot water use to prevent burns which may be 

caused by the high temperature water in the solar installation.

Summary of Contents for V-04212

Page 1: ...Forced Circulation Boilers Installation maintenance use instructions TECHNICAL MANUAL...

Page 2: ......

Page 3: ...TION RULES 8 INSTALLATION POSITION 9 GENERAL PREVENTION MEASURES 10 INSTRUCTIONS FOR THE INTERCONNECTION OF COLLECTORS IN SOLAR FIELDS 10 RECOMMENDATIONS ON HEAT TRANSFER MEANS AND SAFETY AND PROTECTI...

Page 4: ...ses by at least 40 litres daily In order to take full advantage of the solar water heater maximum use of hot water should be made during daytime so that the system can continuously produce hot water d...

Page 5: ...every region and the system s size while at the same time the carbon dioxide emissions are reduced Central solar systems are made of excellent materials according to international specifications and h...

Page 6: ...element rated according to the local regulations of the country of destination Automatically regulated thermostat with bipolar protection and auxiliary fuse The Electrical components for over 300lt ca...

Page 7: ...1 f G Flange for servicing W Upper flange with a magnesium anode MODEL 300 160 Total capacity EN 12897 l 300 160 Actual capacity EN 12897 l 291 156 Net Weight kg 92 54 Insulation mm 50 50 Heat exchang...

Page 8: ...d that insurance for the solar collector is issued GENERAL INSTALLATION RULES ATTENTION Installation must be in compliance with local national rules concerning water and electrical installations plumb...

Page 9: ...lity that may be the result of an inappropriate installation or incorrect use of components used for the solar water heater installation INSTALLATION POSITION The installation is only allowed on roofs...

Page 10: ...alized companies and trained personnel y y Works in electrical installations or conductors have to be executed by trained specialized electro technicians only Labour uniforms y y Have protection glass...

Page 11: ...UM OPERATING PRESSURE PRESSURE DROP MAXIMUM AND MINIMUM INCLINATION ANGLE The maximum operating pressure taking into account the increase in pressure due to the water s expansion must not exceed 400 k...

Page 12: ...rovided with communication keys and a screen on which the parameters and messages are displayed Systems can also be provided with y y Antifrost protection system for the closed loop y y Closed loop ov...

Page 13: ...which we have connected the safety valve 20 the boiler expansion tank 21 the pressure regulator and the non return valve to the position E 6 Connect the hot water consumption 26 to the position C A th...

Page 14: ...rding to the company s instructions In case of any failure condition a specialized technician should be called in A basic periodic maintenance will assure the long life and high efficiency of the sola...

Page 15: ...d UV protection on the thermal insulation Is the piping properly insulated Has the installment on the roof been done according to the local regulations HYDRAULIC CONNECTIONS Are there any leaks in the...

Page 16: ...V2 03 14 www orkli es...

Reviews: