13
SAW ASSEMBLY AND INSTALLATION
UNPACKING YOUR SD SERIES SAW
Your Super Duty series saw system has been completely assembled, tested, and then partially
disassembled. The shipment of your saw contains the following items:
•
The Super Duty Series Saw, (4) frame legs, arbor wrenches, allen hex wrench kit,
hardware to attach legs.
Your machine will be banded down to a shipping skid with the legs removed and
packaged under the table top. To uncrate simply remove the corners and the framing
from the skid and cut the bands that hold the saw to the skid. The unit can them be
picked up with a forklift under the steel frame and then the legs can be installed using the
3/8 bolts, lock washers, and heavy hex nuts. If you purchased extension tables the
brackets can be also added at this time.
Install bolts finger tight and place machine where it is to be set up then tighten legs this will
allow machine to level itself to the floor.
Important
All cable lengths have been adjusted during manufacture to allow for proper movement of
the arm and rollerhead. However, you should check the cables to ensure full range of
movement. If adjustment is necessary, loosen the cable clamp (at right rear of arm) and
adjust the cables so rollerhead is free to travel the total length of the arm with the motor
pivoted in the roller head so the blade is on the right hand side. Also, check to ensure there is
enough slack in the cables between the rear of the arm and the starter enclosure so the arm
can be swung to the right a full 90
0
while the arm is elevated to its highest position.
FLOOR MOUNTING DIMENSIONS
Your saw may be mounted to the floor using 1/2”
diameter hardware appropriate for the floor
surface and located according to the diagram to
the right. All dimensions are center-to-center.
Connecting Electrical Current
The motor is properly connected to the magnetic switch at the factory for operation on the elec-
trical voltage specified. Make sure incoming voltage from your power supply conforms to the
voltage specified on the cover of magnetic starter.
Remove the magnetic switch cover and insert power supply cable through the dust proof fitting.
Connect wires to L1, L2 and L3 for 3 phase; L1 and L2 for single phase (See page photo). Do not
attach power to the transformer. Attach the ground wire to the ground lug inside starter enclo-
sure. Wiring must conform to the National Electrical Code and any applicable local codes.
Summary of Contents for 3553
Page 34: ...34 Intentionally left blank ...