(18.12.17) OC_RPG_L_BA_790038762_01_EN
orbitalum tools
GmbH, D-78224 Singen, www.orbitalum.com, Tel. +49 (0) 77 31 792-0
| 3
RPG 4.5 (S), RPG 8.6
| Operating instructions
About these instructions ......................................4
1.1
Warning messages .....................................4
Further symbols and displays .....................4
1.3 Abbreviations ............................................5
Requirements for the responsible body .......6
2.2 Using the machine .....................................6
2.2.1 Proper use .......................................6
2.2.2 Improper use ...................................6
2.2.3 Machine constraints .........................7
2.2.4 Shutting down the machine ..............7
2.3 Environmental protection/disposal .............7
2.3.1 Chips and gear lubricant ..................7
2.3.2 Electric tools and accessories ..........7
2.4 Basic safety instructions ............................8
2.5
Warning symbols .....................................11
Product design ...................................................12
3.1
Tube Squaring Machines RPG 4.5,
RPG 8.6 ...................................................12
Tube Squaring Machine RPG 4.5 S ............12
3.3 Accessories .............................................13
3.3.1 Multifunctional tool (MFW) .............13
3.3.2 Tool holder (WH) for beveling and
squaring ........................................13
Technical specifications .....................................15
Initial operation .................................................16
6.1
Checking the parts of delivery .................16
Storage and Transport ........................................17
7.1
Transporting the machine .........................17
Setup and assembly ..........................................18
8.1
Fitting the multifunctional tool (MFW)
and the tool holder (WH) ..........................19
8.2 Inserting/replacing the clamping shells
(not with RPG 4.5 S) .................................20
8.2.1 Inserting the lower clamping
shell ..............................................20
8.2.2 Inserting the upper clamping
shell ..............................................20
8.2.3 Replacing the clamping shells ........20
8.3 Clamping the tube ...................................21
8.3.1 RPG 4.5 and RPG 8.6 ......................21
8.3.2 RPG 4.5 S.......................................22
8.3.3 Adjustment options with the
8.3.4 Shifting the adjusting bolt ..............23
.........................................................24
Shutting down (even in an emergency) .....25
Switching the machine on.........................27
Processing the tube .................................27
Switching the machine off ........................27
– General trouble shooting .......................28
10.3 Servicing/customer service ......................29
EU Declaration of Conformity ..............................31
TABLE OF CONTENTS
Summary of Contents for RPG 4.5
Page 30: ......