Assembly
6
Hex Tool With Phillips Screwdriver (13mm/14mm)
A06
A04
A08 B24
B33
B29
M8x45 Nut Cap (C11)
Untie the wire and remove 2 Washers (C22) from the bottom end of the Right Dual Action Arm Set (A04).
Place 2 Washers (C22) back onto the joint of the Right Dual Action Arm Set (A04).
Pull the Right Foot Bar Set (A06) up onto the Right Dual Action Arm Set (A04) and align bolt holes.
Then attach the Right Foot Bar Set (A06) onto the Right Dual Action Arm Set (A04) with 1 Bolt (B24),
1 Nut (B29), and 1 Washer (B33) that were removed.
[Tighten bolt and nylon nut with the Hex Tool with Phillips Screwdriver and M5 Allen wrench provided]
Repeat above steps to install the Left Dual Action Arm Set (A03) onto the horizontal axle of the Front
Post (A02) and Left Wheel Bar Set (A07) onto the Crank (A11) axle.
Fit one Nut Cap (C11) onto M8x16mm Hexagon Head Bolts (B32) of the Right Rotate Bar (A08).
7.)
8.)
M5 Allen Wrench
9.)
Remark: Please use the assembly drawings of steps No. 1-9 at Page No. 7.
(B33)Washer 5/16”x20x2.0t---2PCs
(B29)Nut M8xP1.25x7.7t---2PCs
(B24)Bolt M8x92mm---2PCs
Summary of Contents for Power Stride 23 Elliptical OBE655T
Page 1: ...OBE655T Elliptical Cross Trainer Owner s Manual 23 OBE655T ...
Page 19: ...17 P14 P15 P16 P17 P18 P19 P20 P21 P22 P23 P24 P25 P26 P27 P28 P29 P30 P31 ...
Page 20: ...18 P32 P33 P34 P35 P36 P37 P38 P39 P40 P41 P42 P43 P44 P45 P46 P47 P48 P49 ...
Page 21: ...19 P50 BODY FAT PROGRAM TARGET H R PROGRAM 60 H R C PROGRAM 75 H R C PROGRAM ...