Page 1: ...Original Publication Date Nov 1 2019 Oracle Talari E1000 Hardware Guide ...

Page 2: ...grams No other rights are granted to the U S Government This software or hardware is developed for general use in a variety of information management applications It is not developed or intended for use in any inherently dangerous applications including applications that may create a risk of personal injury If you use this software or hardware in dangerous applications then you shall be responsibl...

Page 3: ...ling the Talari Appliance 14 Unpacking and Inspection 14 Rack Mounting 14 Safety Recommendations 14 4 Post Rack Mounting Recommended 15 2 Post Rack Mounting 17 LAN WAN Connections 18 Important Note About Cabling and Bypass Mode 18 Powering Up the Appliance 18 Network Deployment Options 19 E1000 as a Router Gateway Fail to Block 19 E1000 as Layer 2 Fail To Wire Overlay 19 E1000 with MPLS Internet H...

Page 4: ...racle Support My Oracle Support https support oracle com is your initial point of contact for all product support and training needs A representative at Customer Access Support CAS can assist you with My Oracle Support registration Call the CAS main number at 1 800 223 1711 toll free in the US or call the Oracle Support hotline for your local country from the list at http www oracle com us support...

Page 5: ...port select 2 You are connected to a live agent who can assist you with My Oracle Support registration and opening a support ticket My Oracle Support is available 24 hours a day 7 days a week 365 days a year Emergency Response In the event of a critical service situation emergency response is offered by the Customer Access Support CAS main number at 1 800 223 1711 toll free in the US or call the O...

Page 6: ...al situations affect service and or system operation resulting in one or several of these situations A total system failure that results in loss of all transaction processing capability Significant reduction in system capacity or traffic handling capability Loss of the system s ability to perform automatic system reconfiguration Inability to restart a processor or the system Corruption of system d...

Page 7: ...e on the web at the Oracle Help Center OHC site http docs oracle com You do not have to register to access these documents Viewing these files requires Adobe Acrobat Reader which can be downloaded at http www adobe com 1 Access the Oracle Help Center site at http docs oracle com 2 Click Industries 3 Click the Oracle Communications link Under the SD WAN header select a product 4 Select the Release ...

Page 8: ...e target as or similar command based on your browser and save to a local folder Reference Documents The following documents are available Talari APN Glossary Talari APN Appliance E1000 Installation Guide Talari APN Appliance Quick Start Guide Talari WAN Implementation Guide ...

Page 9: ... a standard 19 inch 480mm four post or two post rack for mounting Software The Talari Web Console is supported in latest versions of the following web browsers Microsoft IE9 IE11 Mozilla Firefox Google Chrome Supported browsers must have cookies enabled Supported browsers must have JavaScript installed and enabled Display A minimum screen resolution of 1024 x 960 or greater is recommended 5 ...

Page 10: ...eliability and application performance with its family of APN Appliances by aggregating and transforming affordable broadband links to deliver business class performance and reliability at consumer prices Talari APN Appliances APNAs are seamlessly added to existing networks to deliver more bandwidth reduced WAN operating expenses and greater reliability than any existing single provider WAN Using ...

Page 11: ...ar Panel Configuration The Talari E1000 may be ordered with three different hardware options Installation will vary based on which E1000 hardware option is being deployed Each E1000 hardware option can be visually identified by comparing the back of the appliance to the E1000 back panel images below Where necessary separate sub sections for each hardware option are provided within this guide 7 ...

Page 12: ... 4 Gigabit Ethernet Bypass pair with Port 3 5 Gigabit Ethernet Non bypass 6 Gigabit Ethernet Non bypass 7 Gigabit Ethernet Non bypass 8 Gigabit Ethernet Non bypass MGT Dedicated management port AUX Gigabit Ethernet Non bypass Used for Manual Installation Console DB9 console port 115200 8 N 1 Used for service and maintenance USB 4 Used for service and maintenance VGA Used for service and maintenanc...

Page 13: ...using existing SFP modules with this appliance the following SFP modules are supported in conjunction with the E1000 10G Fiber 2 Port expansion card FTLX8571D3BCVIT1 Dual Rate 10GBASE SR 1000BASE SX AFBR 709DMZ IN2 Dual Rate 10GBASE SR 1000BASE SX FTLX1471D3BCVI31 Dual Rate 10GBASE LR 1000BASE LX The 10G flex card is also compatible with direct attach twinaxial cable that complies with SFF 8431 v4...

Page 14: ...Hardware Guide Port Description 9 1 Gigabit Ethernet Bypass pair with port 10 10 1 Gigabit Ethernet Bypass pair with port 9 11 1 Gigabit Ethernet Bypass pair with port 12 12 1 Gigabit Ethernet Bypass pair with port 11 1 0 ...

Page 15: ...twork Activity Ethernet Link Status LED Off 10 Mbps or No Connection Green 100 Mbps Orange 1000 Mbps Oracle Talari E1000 Hardware Guide NIC Indicator Codes All Ethernet ports on the E1000 have indicator lights for information on network activity and link status Please note that the indicator lights differ for the bypass and non bypass ports as shown below Bypass Port Indicator Lights Non Bypass Po...

Page 16: ...mm Width 17 2 437mm Depth 26 5 650mm Gross Weight 24 lbs 10 89kg Mounting Options Rack mount rail kit included Link LEDs Link activity Link speed Operating Temperature 41 F to 95 F 5 to 35 C Storage Temperature 40 F to 158 F 40 C to 70 C Humidity Range 8 to 90 non condensing operating environment Capacity 10 individual Gigabit Ethernet Ports User interfaces 2 USB 2 0 ports 2 USB 3 0 ports 1 DB9 Co...

Page 17: ...Oracle Talari E1000 Hardware Guide Mean Time Between Failure MTBF in Hours 186 834 1 3 ...

Page 18: ... Post Rack mount The instructions below will provide the most efficient rack mounting of the device based upon selected rack type Safety Recommendations Prior to installing the device in a rack adhere to the following rack installation guidelines Ensure that there is adequate airflow in the rack Restricted airflow can damage the equipment Leave at least 1U of vertical space between each device ins...

Page 19: ...ails with the arrows indicating front and back of the device in the correct direction Note For both inner and outer rails for the E1000 it is important to ensure that they are pointing in the correct orientation Front or Back even if the arrows or the text are displayed upside down 2 Place one of the Back Outer Rails on top of one of the Front Outer Rails and align the pegs highlighted below in bl...

Page 20: ...he rack and push the device along the rails until you hear a click from the Side Rail Locks on both sides Some slight resistance when sliding the appliance into the rack is expected and intended Removal 5 To remove the chassis pull the device forward out of the rack until the Side Rail Locks are visible 6 Depress the Side Rail Locks highlighted below to allow the device to be unlocked from the rai...

Page 21: ...ter Rail should still be visible once the bracket is joined to the Front Outer Rail Oracle Talari E1000 Hardware Guide 2 Post Rack Mounting Layout Required Components 2x Front Outer Rails 2x Pre Threaded 10 32 Brackets for 2 Post Racks OR 2 Repeat with second Front Outer Rail Installation 9 Facing front of rack install each assembled Front Outer Rail with joined bracket to the two post rack using ...

Page 22: ...ss mode logic used by the appliance represents the functionality provided by a crossover cable This may cause a loss of the link between the Talari appliance and older network devices that do not support Auto MDIX when straight through cables are used to connect the LAN and WAN ports of the Talari appliance In such a case a crossover cable is required from the Talari WAN port to the network device...

Page 23: ...ay Description The E1000 is deployed on the LAN side of the gateway and bypass pairs are configured as Fail To Wire Use this design if you prefer to retain existing edge devices or plan to install an alternative edge device on the WAN side of the Talari Appliance Proceed to the pages below based on your installation method Easy 1st Install Page 15 Manual Install Page 17 E1000 with MPLS Internet Hy...

Page 24: ...age is applied and the appliance will need to be factory defaulted before Easy 1st Install can be attempted again Valid ports for each hardware option are highlighted in green below while invalid ports are indicated with a red symbol E1000 with No Expansion Card Port 1 Gigabit Ethernet Bypass pair with Port 2 Port 2 Gigabit Ethernet Bypass pair with Port 1 Port 3 Gigabit Ethernet Bypass pair with ...

Page 25: ...xpansion card The 10G Fiber expansion card does not support Fail to Wire and the Talari service will not start if a configuration specifying Fail to Wire for these ports is applied to an E1000 with 10G expansion card Port 9 Gigabit Ethernet Bypass pair with Port 10 Port 10 Gigabit Ethernet Bypass pair with Port 9 Port 11 Gigabit Ethernet Bypass pair with Port 12 Port 12 Gigabit Ethernet Bypass pai...

Page 26: ...ate the Site name of the E1000 being deployed 16 Click the Edit pencil to open the Set Serial Number window 17 Enter the serial number of the E1000 being deployed and click the Set Serial Number button Refer to Page 5 for assistance locating the serial number 18 Observe the Upload Activate column Click the Upload Activate text when it appears 19 Continue to observe the Upload Activate column Once ...

Page 27: ...kage is applied A corrected package will have to be uploaded via Local Change Management as outlined in steps 4 7 of Deploying the Talari Appliance to bring up the Talari service E1000 with No Expansion Card Port 1 Gigabit Ethernet Bypass pair with Port 2 Port 2 Gigabit Ethernet Bypass pair with Port 1 Port 3 Gigabit Ethernet Bypass pair with Port 4 Port 4 Gigabit Ethernet Bypass pair with Port 3 ...

Page 28: ...xpansion card The 10G Fiber expansion card does not support Fail to Wire and the Talari service will not start if a configuration specifying Fail to Wire for these ports is applied to an E1000 with 10G expansion card Port 9 Gigabit Ethernet Bypass pair with Port 10 Port 10 Gigabit Ethernet Bypass pair with Port 9 Port 11 Gigabit Ethernet Bypass pair with Port 12 Port 12 Gigabit Ethernet Bypass pai...

Page 29: ... appliance Deploying the Talari Appliance 1 Connect the power cord to the E1000 Connect the other end to an appropriately grounded power source The E1000 will power on automatically 2 Connect your PC directly to the AUX Port of the E1000 3 From the PC connected to the Talari a Change the IP address of your PC to 192 168 0 1 b Change the Subnet Mask of your PC to 255 255 255 252 c Open a web browse...

Page 30: ...plate away and down from the device Pivot the E1000 faceplate down on the built in hinge underneath the faceplate as shown above Appliance Troubleshooting Basics Problem Resolution Cannot ping the E100 APN appliance Make sure the appliance has power Confirm the device has a Management IP address assigned Verify the Management port has link on the Talari and switch Ethernet port not forwarding traf...

Page 31: ...ck If a bypass pair is configured for Fail to Block bypass mode will never be activated even if power is lost If configured bypass mode is used when the APNA is not powered on or when the Talari Service is disabled Please also see the section above Important Note About Cabling and Bypass Mode Problem Resolution Bypass mode blocking traffic Verify that the E100 APN appliance has connectivity to the...