Push the drive into the chassis slot until the ejection lever engages the chassis connectors and
begins to swing closed.
Press the ejection lever closed until it locks in place to seat the drive and lock it into the chassis.
The Activity LED with be steady green to indicate a ready state.
Go to the Maintenance > Hardware screen of the BUI. Click
for the controller and then click
HDD to verify that the
icon is green for the newly installed disk.
▼
Replacing a Power Supply
The power supplies are hot-swappable and can be replaced without removing power from the
system. The power supplies can produce high energy hazard and should only be replaced by
instructed individuals with authorized access to the equipment. Failed power supplies are
indicated by an amber LED on the rear panel, see the Shelf Rear Panel illustration. Go to the
Maintenance > Hardware screen of the BUI. Double click the shelf and then click PSU to view
details or
to turn on the locator LED.
Locate the chassis and failed power supply.
Ensure the power supply on/off switch is in the
"
O
"
off position.
Disconnect the power cord tie strap from the power cord and unplug the power cord from the
power supply.
Using your thumb and forefinger, unscrew both ejection arm captive screws until loose and
swing the ejection arms out until they are fully open.
7
8
9
1
2
3
4
Shelf
Chapter 2 • Hardware Maintenance
89
Summary of Contents for Sun ZFS
Page 1: ...Sun ZFS Storage 7x20 Appliance Customer Service Manual Part No E26399 December 2011 E26399 02 ...
Page 8: ...8 ...
Page 144: ...144 ...
Page 146: ...146 ...