Install the Main Module
The levers should click into place when the module is fully seated in the server.
5.
Connect the power cords.
“Connect Power Cords” on page 201
.
6.
If the you are replacing the main module with a new one, connect a terminal or a
terminal emulator (PC or workstation) to the SER MGT port.
The following message is delivered over the serial management port.
Unrecognized Chassis: This module is installed in an unknown or
unsupported chassis. You must upgrade the firmware to a newer
version that supports this chassis.
7.
Download the system firmware.
a.
Configure the SER MGT port to enable the firmware image to be
downloaded.
Refer to the Oracle ILOM documentation for network configuration instructions.
Servicing the Main Module
107
Summary of Contents for SPARC T7-4
Page 1: ...SPARC T7 4 Server Service Manual Part No E54994 07 May 2017 ...
Page 2: ......
Page 10: ...10 SPARC T7 4 Server Service Manual May 2017 ...
Page 12: ...12 SPARC T7 4 Server Service Manual May 2017 ...
Page 86: ...86 SPARC T7 4 Server Service Manual May 2017 ...
Page 98: ...98 SPARC T7 4 Server Service Manual May 2017 ...
Page 110: ...110 SPARC T7 4 Server Service Manual May 2017 ...
Page 124: ...124 SPARC T7 4 Server Service Manual May 2017 ...
Page 142: ...142 SPARC T7 4 Server Service Manual May 2017 ...
Page 164: ...164 SPARC T7 4 Server Service Manual May 2017 ...
Page 192: ...192 SPARC T7 4 Server Service Manual May 2017 ...
Page 200: ...200 SPARC T7 4 Server Service Manual May 2017 ...
Page 208: ...208 SPARC T7 4 Server Service Manual May 2017 ...