77
Connecting Cables
Perform the following tasks to connect and configure the network and serial ports
before you apply power to the server.
Related Information
■
“Understanding the Server” on page 1
■
“Confirming Server and Site Specifications” on page 9
■
“Preparing for Installation” on page 19
■
“Installing the Server in a 4-Post Rack” on page 27
■
“Installing the Server in a 2-Post Rack” on page 51
■
“Powering On the Server the First Time” on page 91
Step
Description
Links
1.
Plan and configure server connections.
“Connecting Data and Management
Cables” on page 78
2.
(Optional) Review connector descriptions
and pinouts.
“Identifying Ports” on page 82
Summary of Contents for Netra Server X3-2
Page 6: ...vi Netra Server X3 2 Installation Guide May 2013 ...
Page 26: ...18 Netra Server X3 2 Installation Guide May 2013 ...
Page 34: ...26 Netra Server X3 2 Installation Guide May 2013 ...
Page 97: ...Connecting Cables 89 USB Ports on page 86 Video Port on page 86 ...
Page 98: ...90 Netra Server X3 2 Installation Guide May 2013 ...
Page 114: ...106 Netra Server X3 2 Installation Guide May 2013 ...
Page 122: ...114 Netra Server X3 2 Installation Guide May 2013 ...