Powering On the Server the First Time
101
5. Loop the tie wrap over the wires and back out of the strain relief housing,
tightening the tie wrap to secure the wires to the strain relief housing.
6. Lower the top portion of the strain relief housing so that the three prongs on the
top portion insert into the openings in the DC input plug.
Push the top and bottom portions of the strain relief housing together until they
snap into place.
Summary of Contents for Netra Server X3-2
Page 6: ...vi Netra Server X3 2 Installation Guide May 2013 ...
Page 26: ...18 Netra Server X3 2 Installation Guide May 2013 ...
Page 34: ...26 Netra Server X3 2 Installation Guide May 2013 ...
Page 97: ...Connecting Cables 89 USB Ports on page 86 Video Port on page 86 ...
Page 98: ...90 Netra Server X3 2 Installation Guide May 2013 ...
Page 114: ...106 Netra Server X3 2 Installation Guide May 2013 ...
Page 122: ...114 Netra Server X3 2 Installation Guide May 2013 ...