Install the Cable Management Arm (Optional)
b.
Gently tug on the left side of the front slide bar to verify that connector A is
properly seated.
Call Out
Description
1
Connector A tab
2
Left slide-rail front slot
7.
To install CMA connector B into the right slide-rail:
a.
Insert CMA connector B into the front slot on the right slide-rail until it locks
into place with an audible click [frames 1 and 2].
The connector B tab (see callout 1) goes into the slide-rail front slot (callout 2).
52
Oracle Exadata Storage Server X7-2 EF and HC Installation Guide • November 2018
Summary of Contents for Exadata Storage Server X7-2 EF
Page 2: ......
Page 8: ...8 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 10: ...10 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 24: ...24 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 32: ...32 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 66: ...66 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 74: ...74 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 80: ...80 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...
Page 90: ...90 Oracle Exadata Storage Server X7 2 EF and HC Installation Guide November 2018 ...