Callout
Description
1
Connector C locking spring
b.
Insert connector C into the right slide-rail until it locks into place with an audible click,
frames [2] and [3].
c.
Gently tug on the right side of the CMA back slide bar to verify that connector C is
properly seated.
9.
To prepare CMA connector D for installation, remove the tape that secures the slide-rail
latching bracket to connector D, and ensure that the latching bracket is properly aligned
with connector D, frames [1] and [2].
Note:
The CMA is shipped with the slide-rail latching bracket taped to connector D.
You must remove the tape before you install this connector.
Chapter 5
Installing an Oracle ZFS Storage ZS7-2 Cable Management Arm
5-9