38
Acme Packet 6100 Hardware Installation Guide
2.
Line up the painted side of the stationary rail with an appropriate mount
point on the front of the equipment rack.
Figure 4 - 50. Aligning the Slide Rail Front Mount Point in a Square-Hole Rack
3.
For each of the two holes in the slide rail flange, place a #10-32 screw
through the mounting spacer, then through the slide rail flange, and
finally through the square hole in the rack rail.
Mounting Spacer
10-32x5/8” Screw
Slide Rail Flange
Nut Bar
Square-Hole Rack
Figure 4 - 51. Attaching the Slide Rail to a Square-Hole Rack
4.
Hold the nut bar behind the front rack rail.
5.
Using a #2 Phillips head screwdriver, tighten the screws to secure the slide
rail to the equipment rack. Do not completely torque the screws; leave a
small amount of play at this time.
Figure 4 - 52. Installed Slide Rail in a Square-Hole Rack - Front Mount Point
Summary of Contents for Acme Packet 6100
Page 1: ...Acme Packet 6100 Hardware Installation Guide Regulatory Model AP6100 January 2014...
Page 6: ...vi Acme Packet 6100 Hardware Installation Guide...
Page 8: ...viii Acme Packet 6100 Hardware Installation Guide...
Page 12: ...4 Acme Packet 6100 Hardware Installation Guide...
Page 36: ...28 Acme Packet 6100 Hardware Installation Guide...
Page 66: ...58 Acme Packet 6100 Hardware Installation Guide...
Page 96: ...88 Acme Packet 6100 Hardware Installation Guide...
Page 106: ...98 Acme Packet 6100 Hardware Installation Guide...