Identifying Rack Installations and Dimensions
Step
Description
Links
2.
Note any problems or peculiarities at the site that require special
equipment.
3.
Verify that the installation site flooring has a high enough strength
rating to withstand the combined weight of the rack and any
installed equipment.
4.
Install all necessary electrical equipment and ensure that
sufficient power is provided.
Refer to the
Oracle Rack Cabinet 1242 Power
Distribution Units User's Guide
for the power
requirements of the rack PDUs.
5.
Ensure that the installation site provides adequate air
conditioning.
6.
Operate the air conditioning system for 48 hours to bring the
room to the appropriate temperature.
7.
Study the mounting holes and cable routing floor cutouts for your
rack type.
“Floor Cutout Dimensions” on page 25
8.
Study the leveling feet and caster dimensions for your rack.
“Feet and Caster Dimensions” on page 25
9.
Study the rear cabling space for your rack.
“Rear Cabling Space” on page 27
10.
Study the top cable window dimensions.
Related Information
■
“Identifying Rack Installations and Dimensions” on page 24
■
Identifying Rack Installations and Dimensions
These topics describe rack dimensions for the Oracle Rack Cabinet 1242.
■
“Floor Cutout Dimensions” on page 25
■
“Feet and Caster Dimensions” on page 25
■
“Rear Cabling Space” on page 27
Related Information
■
“Site Preparation Task Overview” on page 23
■
“Identifying Rack Installations and Dimensions” on page 24
■
24
Oracle Rack Cabinet 1242 User's Guide • July 2018
Summary of Contents for 1242
Page 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Page 2: ......
Page 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...