Install a Cable Management Hook
3.
Hook the side lip of the nut in the square rail hole [2].
4.
Insert the tip of the cage nut insertion tool through the rail hole, hook the other
side lip of the cage nut, and lever the cage nut into place [2].
Related Information
■
“Prepare Factory-Installed PDUs” on page 37
■
“Install a Cable Management Hook” on page 44
Install a Cable Management Hook
You can route the equipment's data cables using the cable management hooks and spring nuts
found in the ship kit.
1.
Retrieve a cable management hook and screws.
2.
Select one or more locations for the cable management hooks.
There are seven mounting points on each rail. Each mounting point provides four threaded
holes on the frame.
The cable management hook has two holes on its mounting plate. The holes on the cable
management hook must straddle two of the holes
on the inside of the rail
.
44
Oracle Rack Cabinet 1242 User's Guide • July 2018
Summary of Contents for 1242
Page 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Page 2: ......
Page 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...