Prepare Factory-Installed PDUs
5.
Connect the grounding straps from the rack frame to the PDU.
6.
Route the power input lead cords between the rear RETMA rail and side panel.
A PDU has one to three power input lead cords, which you must route between the side panel
and the rear RETMA rail.
Route the power input lead cords either down through the bottom of the rack or up through the
top of the rack, depending on where you plan to connect the cords to the main power source.
Caution -
Never twist, kink, or tightly bend a power input lead.
Preparing PDUs
39
Summary of Contents for 1242
Page 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Page 2: ......
Page 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Page 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...