OptiPure SRO70 Installation Manual Download Page 6

SRO70 Installation Manual 100918 

Step 3

Connect a piece of 3/8” green tubing to the available feed water supply 

valve (angle stop shown in this example). Connect the other end to the 

Feed Water Inlet on  

processor.

Step 4

Install the tank valve on the top of the tank. Connect a piece of 3/8” blue 

tubing to tank valve. Connect the other end to the “To Tank” connection 

on processor. Ensure valve is in OPEN position, as shown.

v

 Make Feed Connections

v

 Make Tank Connections

Summary of Contents for SRO70

Page 1: ...nual Rev 2 2 SRO70_Simple_Install_v2 2 indd 2018 Procam Controls Inc All Rights Reserved Access manuals spec sheets and additional educational materials for foodservice water treatment at our website...

Page 2: ...relative humidity 80 at 88 F 31 C 4 Installation category II 5 Pollution degree II 6 Indoor use only protect from elements Safety Instructions 1 Please read and follow these instructions when connecti...

Page 3: ...to rain or direct sunlight Feed water connection An adequate flow and pressure of water to the unit is essential for successful operation Drain A drain should be located within 5 ft of the system Dra...

Page 4: ...stalling keep line from the Tank to the equipment as short as possible to minimize pressure loss Avoid loops or kinks in tubing Do not cut tubing with wire crimpers or dikes IMPORTANT PROTECT PROCESSO...

Page 5: ...rs or attach directly to studs Be sure to allow 3 clearance below cartridges for removal Step 2 Route the loose end of 1 4 black tubing from processor to a suitable drain and fasten it at the drain So...

Page 6: ...own in this example Connect the other end to the Feed Water Inlet on processor Step 4 Install the tank valve on the top of the tank Connect a piece of 3 8 blue tubing to tank valve Connect the other e...

Page 7: ...ntil all air is purged from system and product water becomes clear Close the feed valve Step 6 The system includes an optional auxiliary connection This connection provides equipment with water that h...

Page 8: ...increase production or determine if higher capacity system is required Install optional Feed Water Pres sure Booster Pump Determine if the demand is unusual or inconsistent or resize system Poor water...

Reviews: