OptiPure SRO70 Installation Manual Download Page 4

SRO70 Installation Manual 100918 

v

 SRO70-2 Installation Diagram

Feed Water Line - 

Green 3/8” - from Feed Water 

Valve to Feed Water Inlet

Feed 

Water

Feed Water 

Inlet

Drain Line

 

- Black 1/4” - from Membrane 

Reject Connection to Drain

Reject Water 

(to Drain)

User-Supplied 

Feed Water Valve

Membrane Reject/

Drain Connection 

Optimized 

Water Outlet

Auxiliary 

Filtered 

Water Outlet

(Plugged if not in use)

CTO-Q10 Pre-Filter

CTO-Q10 Post-Filter

AMS-Q10 Membrane

 

Cartridge

1

3

2

Water 

Processor

To Tank 

Connection

When installing, keep line from the Tank 

to the equipment as short as possible to 

minimize pressure loss.  Avoid loops or 

kinks in tubing. Do not cut tubing with 

wire crimpers or dikes.

IMPORTANT - PROTECT PROCESSOR AND 

TANK FROM THE ELEMENTS.  DO NOT 

INSTALL IN DIRECT SUNLIGHT OR WHERE 

EXPOSED TO FREEZING TEMPERATURES OR 

RAIN.

Optimized Water to

Equipment

(Optional) Filtered 

Water to Equipment

Optimized Water Line to Tank 

- Blue 3/8” - from Processor “To Tank” Connection 

to Tank Inlet

Optimized  

Water Line

- Blue 3/8” 

- Make connection 

to distribution.

(Optional) Filtered Water Line

- Green 3/8” - Make connection to distribution.

Storage 

Tank Inlet 

(on valve)

Optimized Water 

Storage Tank 

- 2 gal. bladder

Storage Tank 

Valve

(Normally Open)

Summary of Contents for SRO70

Page 1: ...nual Rev 2 2 SRO70_Simple_Install_v2 2 indd 2018 Procam Controls Inc All Rights Reserved Access manuals spec sheets and additional educational materials for foodservice water treatment at our website...

Page 2: ...relative humidity 80 at 88 F 31 C 4 Installation category II 5 Pollution degree II 6 Indoor use only protect from elements Safety Instructions 1 Please read and follow these instructions when connecti...

Page 3: ...to rain or direct sunlight Feed water connection An adequate flow and pressure of water to the unit is essential for successful operation Drain A drain should be located within 5 ft of the system Dra...

Page 4: ...stalling keep line from the Tank to the equipment as short as possible to minimize pressure loss Avoid loops or kinks in tubing Do not cut tubing with wire crimpers or dikes IMPORTANT PROTECT PROCESSO...

Page 5: ...rs or attach directly to studs Be sure to allow 3 clearance below cartridges for removal Step 2 Route the loose end of 1 4 black tubing from processor to a suitable drain and fasten it at the drain So...

Page 6: ...own in this example Connect the other end to the Feed Water Inlet on processor Step 4 Install the tank valve on the top of the tank Connect a piece of 3 8 blue tubing to tank valve Connect the other e...

Page 7: ...ntil all air is purged from system and product water becomes clear Close the feed valve Step 6 The system includes an optional auxiliary connection This connection provides equipment with water that h...

Page 8: ...increase production or determine if higher capacity system is required Install optional Feed Water Pres sure Booster Pump Determine if the demand is unusual or inconsistent or resize system Poor water...

Reviews: