Version 1.2.8 - 2020-08-03
24
Translation of original operating manual
MT50
GB
MT
5
0_GB
_3.
fm
4
Assembly
4.1
Unpacking the machine
Install the machine close to its final position before unpacking. If the packaging shows signs of
having possibly been damaged during transport, take the appropriate precautions to prevent
the machine being damaged when unpacking. If damage is discovered, the carrier and/or ship-
per must be notified immediately so the necessary steps can be taken to register a complaint.
Examine the complete machine carefully and check whether all materials, such as shipping
documents, instructions and accessories have been delivered with the machine.
4.2
Scope of delivery
Check the milling machine immediately after delivery for transport damage, missing parts and
loose locking bolts. Compare the scope of delivery with the attached packing list.
4.3
Installation and assembly
4.3.1
Requirements to the installation site
Organize the working area around the milling-machine according to the local safety regulations.
The working area for operating, maintenance and repair must not be hindered.
Check if the underground of the milling-machine is level using a spirit level.
Check if the underground is sufficiently stable and rigid.
ATTENTION!
Insufficient rigidity of the foundation leads to the superposition of
the vibrations of the milling-machine and of the underground (natural frequency of
components). Critical speeds and moves in the axis with displeasing vibrations are
rapidly achieved in case of insufficient rigidity of the whole system and will lead to bad
milling results.
INFORMATION
The main switch of the milling machine must be easily accessible.