Delivery, interdepartmental transport and unpacking
Version 1.0.1 - 2020-08-10
11
Translation of original instruction
GU30S
EN
GU30S
_GB
.f
m
Before starting the transport check the transport route for possible danger points, unevenness
and disturbances as well as for sufficient strength and load capacity.
Danger points, unevenness and disturbance points must be inspected before transport. The
removal of danger spots, disturbances and unevenness at the time of transport by other
employees leads to considerable dangers.
Careful planning of internal transport is therefore essential.
3.2
Unpacking and connecting
The grinding machine is ready for operation. In order to obtain the correct direction of rotation,
the phase sequence must be changed if necessary. This is done at your three-phase connec-
tion or - if equipped with it - at the three-phase connector by changing the phase sequence.
3.3
Scope of delivery
Check the grinding machine immediately after delivery for transport damage, missing parts and
loose locking bolts. Compare the scope of delivery with the delivery note. Grinding wheels and
sanding belts are available in specialist shops or from our main catalogue.
3.4
Storage
ATTENTION!
Incorrect and improper storage might result in damage or destruction of electrical and
mechanical machine components.
Store packed and unpacked parts only under the intended environmental conditions.
Follow the instructions and information on the transport box.
Consult Optimum Maschinen Germany GmbH if the machine and accessories are stored for
more than three months or are stored under different environmental conditions than those spec-
ified here.
3.5
Set-up and assembly
3.5.1
Installation site requirements
Organise the working area around the grinding machine according to the local safety regula-
tions.