opti-solar SP5000	Vitality	Eco Installation & Operation Manual Download Page 1

 

 

 

 

 

Installation & Operation Manual 

SP5000 Vitality Eco

 

 

 

 

 

 

 

 

 
 
 
 
 
 

Summary of Contents for SP5000 Vitality Eco

Page 1: ...Installation Operation Manual SP5000 Vitality Eco...

Page 2: ...This page is intended to be blank...

Page 3: ...Batteries 11 Power Priority 12 To Loads 12 To Battery Charging 12 Product Overview 13 Outline Dimensions 13 Installation 14 Inside the Package 14 Choosing Proper Location 15 Keeping Clearance 15 Moun...

Page 4: ...on 33 Frequency Configuration 34 Mains Charging Battery 34 Set RS485 Address 35 Normal Settings 35 Factory Setting 36 Manual ON OFF 37 LCD Frames 38 Chart of Frames 38 Home Frame 38 Power Frame 1 39 P...

Page 5: ...3 Maintenance 49 Regular maintenance 49 Cleaning Dust 49 Replacing AC Fuse 49 Appendix 50 Specifications 50 Battery Charging Discharging 53 Charging Method 53 Charging Discharging Parameters 53...

Page 6: ...4 Safety Precautions Refer to the Operating Manual There are information of caution operation and installation please read and keep this manual 10 min...

Page 7: ...5...

Page 8: ...ct Information OPTI Solar OPTI International Corp TEL 886 2 22477272 FAX 886 2 22467312 7F No 192 ViewSonic Building Lien Chen Road Chung Ho District New Taipei City Taiwan 235 R O C http www opti sol...

Page 9: ...allation faults such as improper environment wiring and application 3 Working conditions beyond the unit specifications 4 Improper operation of the unit 5 Violation of safety instructions inside this...

Page 10: ...ecially in blackout 5 Unprotected Loads Loads supplied by grid or generator mains directly In case no AC from grid or generator unprotected loads are not powered any more Usually loads larger than SP5...

Page 11: ...Vitality Eco will direct it to battery while PV power is not enough SP5000 Vitality Eco will supply loads from batteries In case you have enabled charging battery from mains SP5000 Vitality Eco will...

Page 12: ...ectly The power to loads is managed to be 1 From SP5000 Vitality Eco only In case the power from solar is enough SP5000 Vitality Eco converts PV power to loads directly In addition surplus PV power in...

Page 13: ...rinciples are the same as Net Metering except that surplus power is not fed to grid This application is suitable for PV power can be fed to grid but not paid Compensating Loads from Batteries This SP5...

Page 14: ...grid mode it is PV Battery Mains AC In on grid mode it is PV Mains AC Battery If Battery Load function is enabled it is PV Battery Mains AC To Battery Charging The power charged to batteries from diff...

Page 15: ...13 Product Overview Outline Dimensions Battery Input Display LCD Operation Keys AC Mains Status LED USB port Manual on off Switch PV input AC Load RS485 port CAN BUS port for multiple units operation...

Page 16: ...m Description A Inverter B Mounting bracket C User manual D Plastic anchor screws x 5 used to fix bracket on wall E RS485 connector plug CANbus connection cable F Spared AC Fuse x 1 30A 250V G Bead fo...

Page 17: ...in or water Install SP5000 Vitality Eco at visible level so you can see its status Fix SP5000 Vitality Eco on a solid surface Keeping Clearance Reserve at least 50 cm distance between the inverters Vi...

Page 18: ...16 Keep distance for the airflow to dissipate heat Mounting Procedure 1 2 3...

Page 19: ...y bracket and template 2 Fix the bracket on inverter attach and fix inverter on wall 3 Take the wiring cover off and fix the inverter by screws Wire Connections Single Unit System Diagram Off grid Ope...

Page 20: ...18 On grid Operation Power Connectors 1 Battery Cables Positive negative 2 PV input 3 AC Load output 4 AC Mains input 1 2 3 4 SP5000 Vitality Eco...

Page 21: ...2 5 7 4 11 6 16 3 Insert wires through bottom plate 4 Crimp the wires with y terminals 5 Insert wires with terminals fix them according to polarity and torque on terminals as figure 6 Fix wires with c...

Page 22: ...tors to SP5000 Vitality Eco Disconnect PV To disconnect PV cables please 1 Turn off DC switch if available in advance 2 Push in the inter locker on PV connectors 3 Pull off the connectors cables Conne...

Page 23: ...w 1 Pay attention and follow the instruction of warning label on the unit 2 Prepare wires of AWG 4 or 50mm2 3 Crimp and wires with ring terminals 4 Watch out the polarities 5 Fix wires on both sides o...

Page 24: ...22 Battery sensor Accessory F Protection cover Protection cover From BAT breaker...

Page 25: ...1 All wires between devices and computer shall be twisted 2 Maximum allowable wire length is 1000 meters 3 The terminal end device may need a terminal resistor 4 Due to multiple connections each indi...

Page 26: ...please connect them as figure below The DIP switch 1 is the terminal resistor switch of the RS485 The default position of this switch is off However if the communication does not work well please try...

Page 27: ...e system according to below figure The wire connections on AC side are indicated as below Up to 6 units Common Battery Bank Grid or Generator Loads AC mains AC load Panel breakers Battery BUS Breaker...

Page 28: ...her cables of inverters Setting the switch for CANbus The CANbus switch is located the right side of RS485 switch labeled as 2 This DIP switch is used to match the impedance for CANbus so as to ensure...

Page 29: ...27...

Page 30: ...arities are correct PV open voltage VPV OPEN is less than maximum voltage of PV input Internal and or external DC switch are on before operation RS485 Wires and cables are locked and fixed Polarities...

Page 31: ...29 Start up Procedure...

Page 32: ...normal or warning conditions red one turns on 2 Text display 2 lines showing status data and instructions Operation keys Key Function Note Exit to previous display Menu Up Menu Down Enter or Confirm a...

Page 33: ...I ni t i al SETTI NGS TAP t o St ar t SET CLOCK 03 DEC 14 09 35 BUZZER CONFI G ON PV STRI NG CONFI G AUTO PV AUTO TAP t o Ent er BUZZER ON TAP t o Ent er 14 DEC 03 09 35 TAP t o Ent er Setting Flow SE...

Page 34: ...e selections are 1 Single only one inverter in this system 2 Parallel The inverter AC mains are connected together AC loads are connected together to build up a bigger systemSet Mode The selections ar...

Page 35: ...ttery during all the time Set Clock To set clock press up and down keys to increase or decrease on blinking characters press Enter to change among day month year hour and minute press Enter to confirm...

Page 36: ...ple if you have a common 1000Ah battery bank for 5 inverters the Ah of individual inverter should be 200Ah The possible selections are 100Ah 400Ah and 500Ah Frequency Configuration The setting is to s...

Page 37: ...fault address is 1 To know the detail of addressing of RS 485 please refer to section of Connecting RS485 Normal Settings Normal setting is used to set the unit whenever you would like to Its process...

Page 38: ...3 DEC 14 09 35 BUZZER CONFI G ON PV STRI NG CONFI G AUTO PV AUTO TAP t o Ent er BUZZER ON TAP t o Ent er BATTERY CONFI G Gener i c 100Ah Gener i c TAP t o Ent er BAT 100Ah TAP t o Ent er 03 DEC 14 09...

Page 39: ...r switches load to AC mains 2 AC does not exist 2 1 In case battery capacity is enough push the button to start inverter 6 Inverter will supply power from battery bank to your loads 2 2 To turn off In...

Page 40: ...XW delivered to loads connected to the inverter Waiting connecting ConnGrid in XXXS Indicating the remaining time for connecting Grid Warning Refer to warning On warning or error happening SETTI NGS T...

Page 41: ...Description From Solar XXXXW The power coming from PV under normal mode Display in 2nd line Description To BAT XXXXW The power charged to battery From BAT XXXXW The power comes from battery To MAINS X...

Page 42: ...Battery status Charging Discharging Standby or Disconnected BAT Level Medium Battery capacity level Full High Medium and Low Setting Frame By pressing 3 times in 2 seconds on setting frame the settin...

Page 43: ...ce agent Monitoring Frame This frame display inverter monitoring data of PV1 DC PV2 DC Mains AC Battery DC Mains frequency and internal temperature alternatively Role Frame In multiple connections thi...

Page 44: ...e output is cutoff O P Short CKT REMOVE CKT Cont Output is short No Battery Check BAT Conn Cont Battery is not connected PV E Low Insul Check PV Wiring Cont Insulation resistance between PV and Earth...

Page 45: ...a The stick must be FAT or FAT32 formatted To do this plug in a USB stick LCD will show Download Data Processing After plugging in the USB all data inside the SP5000 Vitality Eco will be downloaded to...

Page 46: ...44 Capacity of Memory The internal memory can store up to 12 months length of data Data older than this period will be replaced by latest data automatically...

Page 47: ...section 1 Errors on list Read related meaning and take suitable action 2 C Error Switch off all AC and DC Then switch on the DC and then the AC again 3 If above error continues please contact with lo...

Page 48: ...itch on or off terminal DIP switch BAT Load does not work 1 Enable this function in setting menu 2 Make sure Mains charges Battery function is off Internal Comm Error 1 Green status LED is flashing 2...

Page 49: ...problem continues please get help from your local service E8 Frequency of faulty unit cannot be synchronized with other units 1 Make sure AC loads of all inverter in the same phase are connected and...

Page 50: ...rrectly connected 5 Restart the units If problem continues please call local service E12 Over current is detected at mains input 1 Check loads reduce them if necessary 2 Check AC mains connections of...

Page 51: ...ventilation holes 3 Check operation and status if possible 4 Check all wiring and cables Cleaning Dust Use a brush the clean the dust on ventilation holes on both sides Replacing AC Fuse For some abno...

Page 52: ...t A S 100 200 Max Power VA 5000 Input PV DC Maximum Power W 5000 Maximum Voltage V 500 MPPT Range2 V 100 450 Start up Voltage V 150 Maximum Current A 20 Absolute Max Current Isc A 30 MPP tracker No 1...

Page 53: ...load 150 10 seconds for 150 load 200 General Temp Range C 20 554 Max Eff PV AC 96 Max Eff BAT AC 92 Protection IP20 Humidity 0 95 non condensing Cooling Forced Air cooling Variable fan speed control...

Page 54: ...2109 1 62109 2 EMC Emission EN61000 6 4 EN61000 3 11 EN61000 3 12 EMC Immunity EN61000 6 2 Battery Capacity 100Ah 12V x 4 per bank Official Type Refer to table below Note 1 Specifications are subject...

Page 55: ...charging Parameters Type Ah Buck Charging Current Absorption Voltage Float Voltage Cut off Voltage Generic 1 100 20 14 1 13 6 11 0 200 40 14 1 13 6 11 0 300 60 14 1 13 6 11 3 400 60 14 1 13 6 11 3 500...

Page 56: ...7 13 6 10 5 Panasonic LC T12015 100 30 14 5 13 6 10 2 200 60 14 5 13 6 10 2 300 60 14 5 13 6 10 5 400 60 14 5 13 6 10 5 500 60 14 5 13 6 10 5 Note 1 The voltage indicated is for single 12V battery 2 C...

Page 57: ......