7. Connection Procedure
7.3.2. Checking the Parameters and Building
Check the set parameters, execute the program check on the project data and build the
Controller.
1
Double-click
Built-in
EtherNet/IP Port Settings
under
Configurations and
Setup
-
Controller Setup
in the
Multiview Explorer.
2
The Built-in EtherNet/IP Port
Settings Tab Page is displayed
in the Edit Pane.
Click the
TCP/IP Settings
Button, select the
Fixed setting
Option in the IP Address Field,
and confirm that the following
settings are made.
•IP address: 192.168.250.1
•Subnet mask: 255.255.255.0
•Default gateway:
_._._._ (blank)
3
Double-click the
Task Settings
under
Configurations and
Setup
in the Multiview Explorer.
4
The Task Settings Tab Page is
displayed in the Edit Pane.
Click the
Program Assignment
Settings
Button and confirm
that Program0 is set under
PrimaryTask.
5
Select
Check All Programs
from the Project Menu.
19
Summary of Contents for V750 series
Page 51: ...9 Program 2 Initialization processing 48...
Page 52: ...9 Program 49...
Page 53: ...9 Program 3 Connect processing 50...
Page 54: ...9 Program 4 Send processing 51...
Page 55: ...9 Program 5 Receive processing 52...
Page 56: ...9 Program 53...
Page 57: ...9 Program 6 Close processing 54...
Page 58: ...9 Program 7 Processing number error process 55...
Page 60: ...9 Program Program 57...
Page 62: ...9 Program Program 59...
Page 64: ...9 Program Program 61...
Page 78: ...2013 0911 P543 E1 01...