
50
Assembling the CPM2B Boards
Section 3-3
Installing the Expansion I/O Connecting Cables
1,2,3...
1.
Insert the Expansion I/O Cable into the connectors on the CPU Board and
Expansion I/O Board.
2.
Push the cable’s connector into the Board’s connector until both lock levers
lock solidly.
To remove the Expansion I/O Cable, open the connectors lock levers and
pull out the cable’s connector.
CPU Board
Expansion
I/O Board
Expansion I/O Cable
(included with the Expansion
I/O Board)
The cable from the CPU Board
connects to the upper Expansion
I/O Connector (the one with the
short locks.)
Install the shorter connector of
the cable in the lower Board and
the longer connector in the up
per Board.
Lock lever
Lock lever
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com