NV-series PT Simple Operation Handbook
Advanced UsageAdvanced Usage
Ct
i
it
h
Connecti
n
g w
ith
CPIE PLC
Designing Screens
Preparation
35
Connecting PC and PLC via NV
Connect the PC and the PLC via the NV to transfer the ladder programs from
the PC (CX-Programmer) to the PLC and to monitor the PLC from the PC.
Configuration example
In this configuration, you can transfer the ladder programs and monitor the PLC from the
CX-Programmer through the NV.
PC
NV3W-V1/NV4W/NV3Q
Host Link
SYSMAC - CS / CJ / CP Series
PC connection cable
Setting
1. On the CX-Programmer, open a project of a CS, CJ or CP-series PLC.
Double-click the PLC in the project tree. The
Change PLC
Dialog Box will appear.
Double-click!!
2. Set
Network Type
to
NV-Thru (USB Port)
. Click the
OK
Button.
3. Connect the PLC online.
The CX-Programmer and the NV-Designer use the same USB port. Therefore, only one of them is
online-connected with the NV at a time.
You can also connect the PLC through the NV with the CX-Programmer by selecting
Auto Online
-
Direct Connection
from the
PLC
menu.
*The NV requires no setting.
Advanced UsageAdvanced Usage
Summary of Contents for NV3Q-MR21
Page 36: ...2015 0715 0110 V411 E1 02...