EN-6

‹

Electrical Connection

„

Installation of Inverters and EMC filters

For an EMC rules compliant installation consider the following 
points:

Use a line filter.

Use shielded motor cables.

Mount the inverter and filter on a grounded conductive plate.

Remove any paint or dirt before mounting the parts in order to
reach the lowest possible grounding impedance.

„

Wiring Main Circuit Inputs

Consider the following precautions for the main circuit power sup-
ply input.

If a moulded case circuit breaker is used for the power supply connection (R/L1, S/L2, and T/L3), ensure
that the circuit breaker is suitable for the Inverter.

If an earth leakage breaker is used, it should be able to detect all kinds of current should be used in order to
ensure a safe earth leakage current detection

A magnetic contactor or other switching device can be used at the inverter input. The inverter should not
be powered up more than once per hour.

The input phases (R/S/T) can be connected in any sequence.

If the Inverter is connected to a large-capacity power transformer (600 kW or more) or a phase advancing
capacitor is switched nearby, an excessive peak current could flow through the input power circuit, causing
an inverter damage. As a countermeasure install an optional AC Reactor at the inverter input or a DC reac-
tor at the DC reactor connection terminals.

Use a surge absorber or diode for inductive loads near the Inverter. Inductive loads include magnetic con-
tactors, electromagnetic relays, solenoid valves, solenoids, and magnetic brakes.

„

Wiring the Output Side of the Main Circuit

The following precautions should be considered for the output circuit wiring.

Never connect any power source to the inverter output terminals. Otherwise the inverter can be damaged.

Never short or ground the output terminals. Otherwise the inverter can be damaged.

Do not use phase correction capacitors. Otherwise the inverter and capacitors can be damaged.

Check the control sequence to make sure, that the magnetic contactor (MC) between the Inverter and
motor is not turned ON or OFF during inverter operation. If the MC is turned ON during the Inverter is
operation, a large inrush current will be created and the inverter’s over current protection may operate.

„

Ground Connection

The following precautions should be considered for the ground connection.

Do not share the ground wire with other devices, such as welding machines or power tools.

Always use a ground wire, that complies with technical standards on electrical equipment and minimize
the length of the ground wire.

PE

L1

L2

L3

PE

Line

Filter

Load

GND L1

L2

L3

GND

U

V

W

M

~3

Inverter

Ground Bonds
Remove any paint!

Ground Bonds
Remove any paint!

Cable Length
as short as possible

Grounded 
Metal Plate

Screened 
Motor cable

Summary of Contents for L7Z -

Page 1: ...Quick Start Guide L7Z Cat No I62E EN 01...

Page 2: ......

Page 3: ...n 13 Autotuning 14 Autotuning Mode Selection 14 Autotuning Alarms and Faults 15 Autotuning Procedure with Induction Motors 16 Autotuning Procedure for PM Motors 17 PM Motor Encoder Offset Tuning 18 Ri...

Page 4: ...RC interference suppression filters capacitors or overvoltage protection devices to the inverter input or output To avoid unnecessary over current faults etc being displayed the signaling contacts of...

Page 5: ...unauthorized persons must not be allowed access to these inverters Keep these Safety Precautions and Instructions for Use readily accessible and supply them to all persons with any form of access to t...

Page 6: ...is L7 inverter can drive induction motors as well as permanent magnet motors Always select the appropriate control mode For induction motors use V f Open Loop Vector or Closed Loop Vector control A1 0...

Page 7: ...dance grounding of HF interference The use of grounding straps instead of cables is therefore definitely advisable Moreover cable shields must be connected with purpose made ground clips 3 Laying Cabl...

Page 8: ...location without excessive oscillation Install the Inverter in a location free from chlorides Install the Inverter in a location free from direct sunlight Installation Orientation Install the Inverter...

Page 9: ...ter input or a DC reac tor at the DC reactor connection terminals Use a surge absorber or diode for inductive loads near the Inverter Inductive loads include magnetic con tactors electromagnetic relay...

Page 10: ...d ground Cable shields have to be grounded on both cable ends Main Circuit Terminals Main circuit terminal functions are summarized according to terminal symbols in Table 1 Wire the terminals correctl...

Page 11: ...ly for analog references 15 V Max current 20 mA A1 Frequency reference 0 to 10 V 100 0 to 10 V 20 k AC Analog reference neutral E G Shield wire optional ground line connection point Dig ital output si...

Page 12: ...S2 SC IP24V 24V CN5 A1 A3 B1 B3 B2 A2 External Power Supply Sinking Mode NPN S1 S2 SC IP24V 24V CN5 A1 A3 B1 B3 B2 A2 24 VDC Internal Power Supply Sourcing Mode PNP S1 S2 SC IP24V 24V CN5 A1 A3 B1 B3...

Page 13: ...ax 1A 30VDC max 1A M1 M2 M3 M5 M4 M6 Brake Command Factory setting Contactor Control Factory setting Inverter Ready Factory setting Multi function contact output 250VAC max 1A 30VDC max 1A Analog inpu...

Page 14: ...ent Key Selects menu items sets parameter numbers and decrements set values Used to move to the previous item or data DATA ENTER Key Enters menus and parameters and set validates parameter changes RUN...

Page 15: ...rce Analog Input Digital operator b1 02 0 Set up the analog digital I O s in the H1 xx H2 xx and H3 xx parameters Set up the Acceleration Deceleration times C1 xx S Curves Jerk C2 x Make test runs Fin...

Page 16: ...ode Selection As the first thing after power up one of the four control modes must be selected depending on the machine type The Closed Loop Vector modes require PG feedback cards Table 4 shows the re...

Page 17: ...p value E2 02 and the no load current E2 03 after the first run with nominal speed Autotuning for Line to Line Resistance T1 01 2 Non rotating autotuning for line to line resistance can be used in V f...

Page 18: ...tors have to be closed 5 For autotuning the BB and BB1 signals must be ON Inverter must not be in base block condition 6 Confirm that the motor is mechanically fixed and can not move 7 Power is suppli...

Page 19: ...02 2 3 Yes Enter auto tuning mode and set parameter T1 01 2 Set T1 02 Motor rated power T1 04 Motor rated current Press the UP button until Tuning Ready display appears Set T1 02 Motor rated power T1...

Page 20: ...wer supply if it is OFF Check parameter n8 35 If EnDat Hiperface is used check the encoder power supply check the CLOCK and DATA signal wiring Switch off the power supply No Yes Does a OPE06 fault occ...

Page 21: ...nd eliminate the fault source Open the contactors open the base block inputs and close the brake FINISH Is it possible to remove the ropes Does a CPF24 fault occur Balance the car so that it does not...

Page 22: ...Source Selection The speed reference source can be selected using parameter b1 01 The factory setting is the digital operator b1 01 0 i e the speeds can be selected using digital inputs Speed Selecti...

Page 23: ...ut the inverter decelerates to the leveling speed d1 17 when the selected speed signal is removed Inspection Speed can not be selected as travel speed To select the leveling speed as travel speed the...

Page 24: ...f d1 18 is set to 2 and no digital input is set to nominal speed selection the speed reference with speed selection input set is nominal speed d1 09 When the leveling speed signal is set the inverter...

Page 25: ...eleration time n5 05 must be tuned Motor Acceleration Time Auto Tuning n5 05 Before the n5 02 auto tuning is performed the motor data autotuning and the general setup should have been finished Do the...

Page 26: ...Increase the gain to improve the responsiveness to the speed reference Decrease the gain if vibrations or oscillations occur 1 The order of giving the UP or DOWN command has no influence 2 n5 01 shoul...

Page 27: ...04 0 1 or 2 and A1 02 3 or 6 The speed deviation is higher than the F1 10 value for the time F1 11 or longer Reduce the load Lengthen the acceleration time and deceleration time Check the mechanical s...

Page 28: ...rent exceeded the motor over load curve The overload curve is adjustable using parameter E2 01 Motor Rated Current L1 01 Motor Protection Selection and L2 02 Motor Protection Time Con stant Recheck th...

Page 29: ...eck the input voltage and the wiring of the input terminals Extend the settings in C1 01 03 05 07 Main Circuit MC Operation Failure No MC response during Inverter operation Replace the Inverter UV2 CT...

Page 30: ...too high or too low Closed Loop Vector for PM only Check the motor wiring Check the motor rated current input value Reduce or increase the current level for leakage inductance tuning by changing para...

Page 31: ...al P gain 2 Set the proportional gain 2 and the inte gral time 2 of the speed control loop ASR for the minimum frequency The setting is active only for acceleration C5 04 ASR integral I time 2 C5 06 A...

Page 32: ...me Param Num Name Description n5 03 Feed forward proportional gain Speed reference response will increase as the setting of n5 03 is increased n5 05 Motor accelera tion time tuning 0 Disabled 1 Enable...

Page 33: ...Speed agree 1 Inverter ready 1 Minor fault 1 Major fault U2 13 Operation status at fault U2 14 Cumulative operation time at fault Fault History Data U3 01 to U3 04 Last fault to Fourth last fault U3...

Page 34: ...EN 31...

Reviews: