![background image](http://html1.mh-extra.com/html/omron/f3ss/f3ss_instruction-manual_1633198028.webp)
B-1 Checkout Procedure Log
Appendix B —Checkout Procedure
24
Appendix B
—
Checkout Procedure
B-1 Checkout Procedure Log
The following Checkout Procedure must be performed by qualified personnel during initial F3SS installation and
at least every three months or more frequently depending on a machine usage and company guidelines.
Hint:
make a copy of the checkout procedure form and use the copy as the checkout log to be kept with the
machine records. Use caution when working around hazardous voltages which may be present during this pro-
cedure.
Machine Identification: Date:
Comments:
Technician Signature:
Item
Condition
Comments
1.Verify the guarded machine is compatible with the type of machine which
may be used with a F3SS.
Pass
Fail
2.Verify that the mounting distance of the F3SS is equal to or greater than
the minimum safe distance from the point of operation.
Pass
Fail
3.Determine that all access to the danger point not protected by a F3SS
are guarded by other means, such as gates, fencing, wire screening or
other approved methods. Verify that all additional guarding devices, inter-
lock switches and mechanical barriers are installed and operating properly.
Pass
Fail
4.Verify that the F3SS can only be reset from a position outside and within
the view of the hazardous machine area.
Pass
Fail
5.Inspect the electrical connections between the guarded machine control
circuitry and the F3SS. Verify that they are properly connected to the
machine such that a stop signal from the F3SS results in an immediate halt
at any point in the machine’s cycle or stroke.
Pass
Fail
6.Record the test results in the machine log. Next, perform the Test Proce-
dure.
Pass
Fail
Summary of Contents for F3SS
Page 4: ......