Section 2 Wiring and Mounting
B-19
Combination with the F3SP-B1P
KM1
KM2
S2
Emitter
Receiver
S1: External test switch
S2: Interlock/Lockout reset switch
KM1, KM2: Relay that control the dangerous zone, etc.
K3: Load, PLC, etc. (Used for monitoring)
Emitter cable
F39-JC B-L
Receiver cable
F39-JC B-D
A1
T31
PE
T32
P1
14
24
34
42
41
33
23
13
X1
H1
J1
L1
H1
A2
K1
K2
K1
K2
OSSD1
OSSD2
Interlock
selection
Reset
EDM Auxiliary
Test
S1
KM1
KM2
F3SP-B1P
S3
X1
H1
J1
L1
H1
Interlock
selection
Reset
Test
S1
Wiring for the Auto reset mode
S3: Lockout reset switch
(If the swithch is not necessary, connect between X1 and H1.)
K3
Note1:
Use a switch which can apply small load.
Note2:
If the EDM is not necessary, short-circuit T31 and T32.
Wiring for the Manual reset mode and the EDM function
(Note1)
(Note1)
(Note1)
(Note1)
(Note2)
+
24V
DC
0 V
Power
supply
Summary of Contents for F3SN-B P Series
Page 10: ...A 3 1 2 4 b b OFF 300ms 1 b 9V Vs 2 4 1 2 5 2 1 mm...
Page 14: ...A 7 2 1 2 1 1 F3SN B F3SN B...
Page 17: ...A 10 2 1 3 D 0 2 3m 0 27m 3m L 2 tan10 L 0 087 m 2 1 4 F3SN B 2 F3SN B L D D L D 10 10...
Page 18: ...A 11 0 2 3m 0 54m 3m L tan10 L 0 18 m L D D 10 10...
Page 21: ...A 14 2 3 2 3 1 F3SN B R36 mm 52mm R 3 6 R 3 6 R 3 6 80mm 80mm...
Page 23: ...A 16 1 2 3 2...
Page 30: ...A 23 1 2 F3SN B 1 3 5 OFF 1 F3SN B P70 4 9 24V OFF 5 6 1 3 3 2 3 F3SN B 4...
Page 31: ...A 24 2 2 8 1 4 1 5 6 5 6 7 3 24V 2 3 1 4 1 2 2 2 0V RS 485 B RS 485 A 7 1 24V 2 2 4 2 NO...
Page 32: ...A 25 OFF OFF OFF ON OFF 25 s 160 200 s OFF OFF ON ON OFF 130 s ON...