![Omron CJ1W- ECT21 Operation Manual Download Page 118](http://html1.mh-extra.com/html/omron/cj1w-ect21/cj1w-ect21_operation-manual_742071118.webp)
Appendices
A - 4
CJ-series EtherCAT Slave Units Operation Manual (W541)
This section provides the setting procedure for establishing EtherCAT Slave Unit communications.
1
With the power OFF, set the unit number and node address with the corresponding hardware
switches. Refer to
2
Mount the EtherCAT Slave Unit to the CPU Rack. Refer to
2-2-2 Mounting to a CJ-series PLC
3
Connect the communications cable between the EtherCAT master and EtherCAT Slave Unit.
Refer to
4
Connect the CX-Programmer to the CJ-series CPU Unit.
5
Turn ON the power supply to the CJ-series PLC.
6
Place the CX-Programmer online with the CJ-series CPU Unit.
7
Create the I/O table with CX-Programmer. Refer to
8
Set the I/O Communication Area Setting Table. Refer to
3-4-2 Setting Procedure with the
The example is shown below.
A-1-4
CJ1W-ECT21 Setting Procedure
Summary of Contents for CJ1W- ECT21
Page 1: ...Cat No W541 E1 02 OPERATION MANUAL SYSMAC CJ Series CJ1W ECT21 EtherCAT Slave Unit ...
Page 8: ...CONTENTS 6 CJ series EtherCAT Slave Units Operation Manual W541 ...
Page 30: ...Revision History 28 CJ series EtherCAT Slave Units Operation Manual W541 ...
Page 32: ...Sections in this Manual 30 CJ series EtherCAT Slave Units Operation Manual W541 ...
Page 148: ...Appendices A 34 CJ series EtherCAT Slave Units Operation Manual W541 ...
Page 149: ...I 1 I CJ series EtherCAT Slave Units Operation Manual W541 Index ...
Page 152: ...I 4 CJ series EtherCAT Slave Units Operation Manual W541 Index ...
Page 153: ......