background image

 

BP100XSG/BP150XSG Instruction Manual

1

2

Tighten the 4 screws.

Pb

Battery replacement is now complete.

 7. Attach the front panel.  

Push the front panel toward the main body. 

Use a screwdriver to securely tighten (clockwise) the 4 screws at the top of the front 

panel. 

2

 

Write the date you started using the battery on the included battery replacement 

date label, and attach it to the front panel. 

Also, by using the included UPS monitoring software, possible to keep a record 

of usage start date by the software.

<After replacing the battery when operation was stopped...>

Connect the AC input plug to a wall outlet (commercial power) and turn ON the 

power switch of the UPS. When operation starts, the self-diagnostic test is automati-

cally performed. Normal operation resumes after the 10-second test. 

<After replacing the battery during operation...>

If the battery replacement indicator is displayed and the beeper sounds before  

replacement, press the beep stop/test switch once to stop the beeper, and hold it 

for 5 sec. to perform a self-diagnostic test. The beeper stops and normal operation 

resumes after the 10-second test is complete.

 

u

NOTE

u

Battery recycling

 

l

The unit uses lead acid batteries, which are a valuable recyclable resource.  

Please recycle.

Summary of Contents for BP100XSG

Page 1: ...ttery pack for uninterruptible power supply UPS For BU1002SWG Model BP100XSG For BU3002SWG Model BP150XSG Safety precautions Important information for safe operation is described Be sure to read it be...

Page 2: ...ectric shock Keep plastic package bags and films out of reach of children l l Children may suffocate if they place their heads into plastic bags and films uNOTEu Battery recycling l l The unit uses le...

Page 3: ...and there is no damage found on their ap pearance If you should notice defects or anything wrong contact the shop of purchase l l Compliance Information Sheet 1 l l Battery pack fixing screw spare 2 2...

Page 4: ...of the battery to gauge how much further you need to pull the battery to remove it Hold the battery securely with both hands so as not to drop it Caution Do not hold the connector or cable of the batt...

Page 5: ...will go and store it 1 l l Replacement battery pack For BU1002SWG Model BP100XSG Attach the plate cover Insert the hook on the bottom side of the plate cover into the hole of the main body 2 and push...

Page 6: ...front panel Insert the hook on the bottom side of the front panel into the hole of the main body 1 and push the front panel toward the main body 2 Use a screwdriver to securely tighten clockwise the...

Page 7: ...and remove the bottom battery connector from the through hole 4 Hold the pullout label at the bottom of the battery pack and remove the battery pack Remove the upper and bottom battery packs one by on...

Page 8: ...rt new batteries in both upper and bottom parts as far as it will go and store them 1 l l Replacement battery pack For BU3002SWG Model BP150XSG 2 required Pass the upper part of the bottom battery con...

Page 9: ...ng the battery when operation was stopped Connect the AC input plug to a wall outlet commercial power and turn ON the power switch of the UPS When operation starts the self diagnostic test is automati...

Page 10: ...dustrial omron hu Italy Tel 39 02 326 81 industrial omron it Netherlands Tel 31 0 23 568 11 00 industrial omron nl Norway Tel 47 0 22 65 75 00 industrial omron no Poland Tel 48 22 458 66 66 industrial...

Reviews: