53
2. 2-POINT (ON-OFF) CONTROL
When PID control is specified as the control type, setting P to 0.0
provides the 2-point (ON-OFF) control operation.
(2-point operation hysteresis)
Set the 2-point operation hysteresis
with engineering values. (0~100%
FS D.E.U.)
3. FUZZY CONTROL
Employing Fuzzy Logic control eliminates system overshoot and
effectively suppresses fluction of the process variable due to external
disturbances. See the section describing control type setting (page75).
NOTES
1. The dual output type does not allow use of fuzzy control.
2. Though the fuzzy control also requires setting of parameters P, I,
and D, these values can be set to those being used in PID control.
Auto tuning is also available.
4. DUAL CONTROL
* This function is an option.
If the process heats itself, cooling control is needed in addition to
heating control. The dual control is used for control of that process.
HYS
PV
Set point
Output OFF
Output ON
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Summary of Contents for FUZZY LOGIC CN4800
Page 2: ...M1791 Artisan Technology Group Quality Instrumentation Guaranteed 888 88 SOUR...
Page 47: ...45 ogy Group Quality Instrumentation Guaranteed 888 88 SOURCE...
Page 100: ...98 MEMO ogy Group Quality Instrumentation Guaranteed 888 88 SOURCE...
Page 101: ...99 MEMO ogy Group Quality Instrumentation Guaranteed 888 88 SOURCE...