AWS Installation and operating manual
www.omega-air.si
5
For the water supply a galvanized pipe is required with a 1/2˝ inner thread.
Grounding:
It is mandatory to properly ground the equipment. The grounding wire is mostly required to
be of a cross-section equal to the sum of all supply wire cross-sections if that is equal or less
than 16mm
2
. If different regulations apply for your region, you are obligated to follow these.
The AWS has to be operated outdoors or in a room with sufficient ventilation, because the
equipment emits a high amount of heat when turned on. The working space needs proper
openings for cooling.
If a proper air supply cannot be guaranteed with windows or other openings, ventilators are
required for forced ventilation. The ventilators need to guarantee a 15-20% greater amount
of cooling air that is needed for perfect cooling of all the compressors.
ATTENTION!
The ventilation openings have to be set up in a way to avoid the intake of
dust, lacquer, gasses or other explosive mixtures. Do not set the
equipment up in a dusty place or close to gas drains. The AWS is designed to
work at temperature from -15 to +45 °C. If the equipment is subjected to
temperatures out of this rank, damage may occur on the aggregate.
Picture 2: Attachment of the compressor to the basis
The compressor is attached to the ground/base
through 4 bolts
The bolts are in the attached in the food from
the inner side, preventing an easy takeaway of
the lock protected compressor.