AWS Installation and operating manual
4
www.omega-air.si
the compressor is properly set, you have to attach it to the ground with bolts or screws
(note to detach the compressor before moving it with the forklift)
. Each professional unit is
in accordance with all the valid standards and subjected to intern test procedures. But
checking the equipment before transport cannot prevent any damage that might appear
during it. For this reason, the equipment is to be thoroughly checked before the start-up, to
prevent any possible damage. Keep the compressor under observation the first working
hours to find any possible faults.
INSTALLATION AND CONNECTION
Preparing the place for installation and assembly
Example of the basis:
Picture 1: Dimensional drawing of the AWS basis
At the basis, if there is a shaft a steel construction is advised (contact the manufacturer). The
preparation of an appropriate basis is shown in the attachment. When setting up the foot of
the equipment, spacers are mandatory for the connection of the foot and the basis.
Electric installation:
Supply cable with 3×2.5 mm
2
wires, protected by 16 A type C circuit breakers. The length of
the cable is a minimum of 0.5m.
Condensate drain preparation:
For the condensate drain, a 1/2˝galvanized pipe with an inner thread ending is required. The
condensate drain connects to the drain on the central reservoir.
Water supply preparation: