Omec PL.06.00 Instruction, Use And Maintenance Manual Download Page 8

 
 

 

 

 
By keeping pushed one of the two keys (

 or 

) for a time shorter than 2 seconds, the change of 

parameter will be by one step corresponding to 1 hour a press. 
 
For  a  rapid  change  the  operator  has  to  keep  one  of  the  two  keys  (

  or 

)  pushed  for  a  time 

longer than 2 seconds. In this case the change of parameter will be by 10 steps correspondent to 
10 hours a second until the release of the key. 
 

Press 

 key to confirm entry and pass to programming of minutes. 

 
On  display  now  you  will  see  the  two  numbers  on  the  right  side  of  the  dot  (showing  minutes  ) 
still while the two numbers on the left side of the dot (showing the hours) flashing. 
 

The modification of this parameter (range of programming 00/59 minutes) is done by using 

 key 

(to increase value) and 

 key(to decrease value). 

 
By keeping pushed one of the two keys (

 or 

) for a time shorter than 2 seconds, the change of 

parameter will be by one step corresponding to 1 minute a press. 
 
For  a  rapid  change  the  operator  has  to  keep  one  of  the  two  keys  (

  or 

)  pushed  for  a  time 

longer than 2 seconds. In this case the change of parameter will be by 10 steps correspondent to 
a 10 minutes a second until the release of the key. 
 
In case a value equal to 00.00 is set, the time of boiling is not included. 
 

Press 

 key to confirm data entry. The word OFF appears on the display. 

 

3.4.1  START UP PROGRAMMING 

 

 
After having programmed the cycle there are two options for the operator: 
 

-

 

immediate switching on 

-

 

deferred switching on 

 

During programming of start-up the red leg of 

 key flashes intermittently. 

 

- Immediate switching on 

 
Polymerizing unit on OFF: press the START/STOP key. 
 
Four zeroes separated by a dot will appear on display. 
 
Press the START/STOP key twice (2 times) and the cycle is activated immediately. 
 

- Deferred switching on 

 
Polymerizing unit on OFF: press the START/STOP key. 
 
Four zeroes separated by a dot will appear on display. 
 
The  two  still  zeroes  on  the  left  side  of  the  dot  indicate  the  hours  while  the  two  flashing 
zeroes on the right side of the dot indicate the minutes. 
 
The first parameter to change are the hours. 
 

The modification of this parameter (programming range 00/99 hours ) is done by using 

 key (to 

increase value) and 

 key (to decrease value). 

 
By keeping pushed one of the two keys (

 or 

) for a time shorter than 2 seconds, the change of 

parameter will be by one step corresponding to 1 hour a press. 
 
For  a  rapid  change  the  operator  has  to  keep  one  of  the  two  keys  (

  or 

)  pushed  for  a  time 

longer than 2 seconds. In this case the change of parameter will be by 10 steps correspondent to 
a 10 hours a second until the release of the key. 

 

Press the START/STOP key to confirm entry and to go to programming of minutes. 
 
On  display  now  you  will  see  two  still  numbers  on  the  right  side  of  the  dot  (indicating  the 
minutes) while the two numbers on the left side of the dot (indicating the hours) are flashing. 
 

The modification of this parameter (programming range 00/59 minutes) is done by pressing the 

 

key (to increase value) and 

 key (to decrease value). 

 
 

- Page 6/9 - 

 

Summary of Contents for PL.06.00

Page 1: ...K Machine POLYMERIZING UNIT Type PL 06 00 PL 12 00 O M E C Snc di R CARNEVALE C Via dell Artigianato 3 5 7 I 20835 Muggi MB ITALY Tel 39 039 793740 Fax 39 039 2780689 E Mail export omec snc com omecsn...

Page 2: ...allation 2 9 3 2 1 Picture No 1 2 9 3 2 2 Picture No 2 3 9 3 3 1 Programming of cycle 4 9 3 4 1 Start up programming 6 9 3 5 1 Working cycle 7 9 3 6 1 Inspections 7 9 3 7 1 Power failures 8 9 3 8 1 Wa...

Page 3: ...and not damaged due to bad carrying b Follow carefully the instructions for installing the machine c The OMEC POLYMERIZING UNIT TYPE PL 06 00 PL 12 00 must be used only by a skilled worker and therefo...

Page 4: ...ic equipment has a good earth and that it is in conformity with the 2006 95 EC Low Voltage 3 1 1 INSTALLATION Verify the apparatus has not stood any evident damage during transportation Place the appa...

Page 5: ...lding time 7 Value increasing key 8 Value decreasing key 3 2 1 PICTURE NO 2 3 3 1 PROGRAMMING OF CYCLE To program a cycle follow correctly and as in the indicated order the instructions below Turn on...

Page 6: ...never to set a value lower then 13 otherwise the heating will be too slow while setting this value always consider the quantity of water inside the tank the more water there is in the tank the slower...

Page 7: ...n sequence If the operator has set FULL as temperature value boiling temperature then the words FULL max speed will appear on display In this case the speed increase is automatically set at FULL max v...

Page 8: ...perator immediate switching on deferred switching on During programming of start up the red leg of key flashes intermittently Immediate switching on Polymerizing unit on OFF press the START STOP key F...

Page 9: ...erature set on the display is reached the time holding value set for the running phase followed by the real temperature of the water inside the tank will be shown on the display just for a few seconds...

Page 10: ...in phases no 1 and no 2 When power returns two cases may present If the power has failed for a short time and the water temperature has not decreased the polymerizing unit will run again all the progr...

Page 11: ...d do not put cable in places where it can be stepped over In case of extended inactivity disconnect the electrical cable Before any transportation always empty the tank and use the original packaging...

Reviews: