Omec PL.06.00 Instruction, Use And Maintenance Manual Download Page 5

 
 

 

 
 

Data display 

Orange led – Activated heating element 

Cycle programming key 

Cycle start up programming key / In progress cycle stop key 

Flashing red led = in progress program 

Still red led = in progress deferred start up timer 

 

Orange led = rising to programmed temperature 

 

Green led = in progress holding time 

Value increasing key 

Value decreasing key 

 

 

3.2.1  PICTURE NO.2 

 

 
 

3.3.1  PROGRAMMING OF CYCLE 

 

To program a cycle follow correctly and as in the indicated order the instructions below: 
 
Turn-on machine 
 
The polymerizing unit is started up by turning the general switch to ON position (I). 
The inside green light will light up. 
The word OFF will appear on display. All led will be off. 
In case numbers appear on display, press START/STOP key to put the polymerizing unit on state of 
IDLE-OFF. 

 
 
 
 
 
 

- Page 3/9 - 

 

Summary of Contents for PL.06.00

Page 1: ...K Machine POLYMERIZING UNIT Type PL 06 00 PL 12 00 O M E C Snc di R CARNEVALE C Via dell Artigianato 3 5 7 I 20835 Muggi MB ITALY Tel 39 039 793740 Fax 39 039 2780689 E Mail export omec snc com omecsn...

Page 2: ...allation 2 9 3 2 1 Picture No 1 2 9 3 2 2 Picture No 2 3 9 3 3 1 Programming of cycle 4 9 3 4 1 Start up programming 6 9 3 5 1 Working cycle 7 9 3 6 1 Inspections 7 9 3 7 1 Power failures 8 9 3 8 1 Wa...

Page 3: ...and not damaged due to bad carrying b Follow carefully the instructions for installing the machine c The OMEC POLYMERIZING UNIT TYPE PL 06 00 PL 12 00 must be used only by a skilled worker and therefo...

Page 4: ...ic equipment has a good earth and that it is in conformity with the 2006 95 EC Low Voltage 3 1 1 INSTALLATION Verify the apparatus has not stood any evident damage during transportation Place the appa...

Page 5: ...lding time 7 Value increasing key 8 Value decreasing key 3 2 1 PICTURE NO 2 3 3 1 PROGRAMMING OF CYCLE To program a cycle follow correctly and as in the indicated order the instructions below Turn on...

Page 6: ...never to set a value lower then 13 otherwise the heating will be too slow while setting this value always consider the quantity of water inside the tank the more water there is in the tank the slower...

Page 7: ...n sequence If the operator has set FULL as temperature value boiling temperature then the words FULL max speed will appear on display In this case the speed increase is automatically set at FULL max v...

Page 8: ...perator immediate switching on deferred switching on During programming of start up the red leg of key flashes intermittently Immediate switching on Polymerizing unit on OFF press the START STOP key F...

Page 9: ...erature set on the display is reached the time holding value set for the running phase followed by the real temperature of the water inside the tank will be shown on the display just for a few seconds...

Page 10: ...in phases no 1 and no 2 When power returns two cases may present If the power has failed for a short time and the water temperature has not decreased the polymerizing unit will run again all the progr...

Page 11: ...d do not put cable in places where it can be stepped over In case of extended inactivity disconnect the electrical cable Before any transportation always empty the tank and use the original packaging...

Reviews: