background image

13

Operation

aligning the corresponding holes on the sides). In the case of machines with table length up to 950mm, the 

operation can be performed by one person only while the simultaneous presence of two people is necessary 

for greater lengths.

USE OF THE MACHINE TO SHEET DOUGH

1.  Place the dough mass, whose thickness must be less than 45mm, on one of the worktables; the dough 

mass must not be worked on the sheeter worktables with rolling pins (and absolutely not beaten) nor with 

bare hands: the worktables are not designed to support abnormal stresses and/or blows.

 

IMPORTANT! Do not load dough masses that exceed the maximum limits foreseen. The temperature 

of the dough mass to roll must be approximately equal to that of the work environment; the entire 

dough mass must be easily malleable. It is absolutely forbidden to roll blocks of dough that are not 

malleable, if just taken out of a freezer, for example. The manufacturer shall not be responsible in 

any way for damage caused by failure to observe these instructions.

2.  Turn on the machine.

3.  Start sheeting in alternating directions, adjusting the distance between the rollers each time.

4. 

If necessary, sprinkle flour on the dough between one rolling pass and the next.

5.  Do not handle masses of dough manually that are so heavy or so big as to be hard to support. This is to 

prevent risks of an ergonomic type with the possibility of muscle-skeleton injuries.

6.  The machine stops when a guard is raised. To resume work, lower the guards, press the enabling button, 

and then actuate the start and movement inversion controls.

7. 

The machine stops if the emergency button is pressed. To resume work, rearm the button (turn it in the 

direction of the arrow on the top), press the enabling button, and then actuate the start and movement 

inversion controls.

8. 

Before the last rolling pass, raise the rolling pin support; insert the rolling pin into the deepest seat and 

wrap a little of the pastry arriving from the last sheeting stage around it: all the pastry will wrap around the 

rolling pin and will be kept turning by the friction between the wrapped dough and the belt.

9. 

When all the sheet is wrapped round it, move the rolling pin to the least deep seat or take it off the 

machine.

10. To resume the sheeting operations in order to obtain a new pastry sheet it is necessary to shift the rolling 

pins (both empty and full) off the machine and lower the supports.

Turn off the machine at the end of work (turn the switch to O - OFF) and clean it.

SUSPENDING THE USE OF THE MACHINE TEMPORARILY AND PARKING IT

When it is envisaged that the machine will not be used for a significant time:

• 

Clean every part of it thoroughly.

• 

Take it to the place where you wish to park it.

• 

Put the worktables into a stable raised position; check that the supports are properly inserted into the top 

supports.

Summary of Contents for BE-IT-710-CSS

Page 1: ...Dough Sheeters Models BE IT 710 CSS 710 FSS Items 49115 49116 Instruction Manual Revised 09 22 2022 Toll Free 1 800 465 0234 Fax 905 607 0234 Email service omcan com www omcan com...

Page 2: ...27 Table of Contents Section General Information Safety and Warranty Technical Specifications Installation Operation Maintenance Troubleshooting Parts Breakdown Electrical Schematics Notes Warranty R...

Page 3: ...e It s of the utmost importance to save these instructions for future reference Also save the original box and packaging for shipping the equipment if servicing or returning of the machine is required...

Page 4: ...influencia de droga o alcohol y que este ha sido entrenado en el correcto funcionamiento de esta m quina y sta usando ropa apropiada y autorizada Cualquier modificaci n a la m quina an la la garant a...

Page 5: ...air must be gathered up and fastened e g in a cap the work clothing must be adequate for the hygiene requirements of the foodstuffs processed worked Never allow inexpert persons or minors or unauthori...

Page 6: ...ling the worktables and cutting unit etc ASSOCIATED WITH INHALING DUST Possible harm to the airways rhinitis lacrimation asthma etc if when sprinkling flour on the pastry the operator does not take th...

Page 7: ...d and then press the enabling button OPENING REMOVINGTHEGUARDSAND ORDEACTIVATINGTHESAFETYDEVICESISABSOLUTELY FORBIDDEN RESIDENTIAL USERS Vendor assumes no liability for parts or labor coverage for com...

Page 8: ...fied technicians who are able to issue the envisaged declaration of conformity if required Appropriate devices for protection from overloads short circuits and phase phase phase neutral if pertinent a...

Page 9: ...the greatest extent possible Raise the machine only the minimum necessary and prevent shocks and then lay it down as soon as possible as soon as it is on the ground the machine can be moved simply by...

Page 10: ...conductors take care not to invert a phase conductor and the ground one Use the special ground system its efficiency must be checked periodically Do not connect to gas or water pipes or other metal s...

Page 11: ...risks caused by dispersed dust e g before sprinkling the flour check that there is no one in the vicinity wear a mask for protecting the airways with an adequate filtering power for the flour grain d...

Page 12: ...support enter the lower supports For worktables with length 950mm the second operator must make the support come out from the top supports and while the worktable is lowered slowly make it enter well...

Page 13: ...upport This is to prevent risks of an ergonomic type with the possibility of muscle skeleton injuries 6 The machine stops when a guard is raised To resume work lower the guards press the enabling butt...

Page 14: ...starting any operation Do thorough cleaning of the machine at the end of the day or work shift Check the integrity and efficiency of safety guards and devices at the start of each day or work shift AD...

Page 15: ...ort and pull it upwards and then remove it TO MOUNT THE SCRAPER ASSEMBLY Position the scraper assembly above the roller and press it downwards in such a way that the plastic scrapers slot into the sid...

Page 16: ...NGE THE BELT S Turn the nut to loosen the belt s just enough to make it come out of the pulley grooves if there is more than one transmission belt it is absolutely necessary to replace all of them and...

Page 17: ...chine Remove the top and bottom scrapers the scraper assemblies can also be washed separately using neutral washing up liquid provided that they are thoroughly rinsed and that you wait until all their...

Page 18: ...therwise accumulations and incrustations could form in some points and could be difficult to remove as time passes Fault and or anomaly Possible causes Remedies The machine will not go on No power Che...

Page 19: ...19 Parts Breakdown Model BE IT 710 CSS 49115...

Page 20: ...49115 41 AK596 Belt Stretching Cylinder for 49115 69 AK541 Spacer for 49115 14 AK569 Fixed Cylinder for 49115 42 AK597 Conveyor Belt for 49115 70 AK542 Spacer for 49115 15 AK570 R H Belt Drive Cylind...

Page 21: ...21 Parts Breakdown Model BE IT 710 FSS 49116 Base Assembly...

Page 22: ...22 Parts Breakdown Model BE IT 710 FSS 49116 Head Assembly...

Page 23: ...88 Spring for 49116 49 AK645 Bearing 6004 2RS for 49116 6 AK667 Guard for 49116 27 AK689 Microswitch Plate for 49116 50 AK646 Seeger Ring for 49116 7 AK668 Fixed Cylinder for 49116 28 AK690 Manual Mov...

Page 24: ...24 Electrical Schematics Model BE IT 710 CSS 49115...

Page 25: ...25 Electrical Schematics Model BE IT 710 FSS 49116...

Page 26: ..._______________ ________________________________________________________________________________________ ________________________________________________________________________________________ ______...

Page 27: ...ter online by visiting OMCAN PRODUCT WARRANTY REGISTRATION 3115 Pepper Mill Court Mississauga Ontario Canada L5L 4X5 https omcan com warranty registration or email to service omcan com Purchaser s Inf...

Page 28: ...relations avec nos clients et les fabricants de valeur Aujourd hui avec des partenaires en Am rique du Nord Europe Asie et Am rique du Sud nous travaillons continuellement am liorer et d velopper l e...

Reviews: