background image

ROERO - TST

________________________________________________________________________________

19

Greasing- Lubrification

Overgear unit

oil type SPARTAN 220

quantity: 1.50 litres

check the level every 50 hours with the special rod A

replace the oil after the first 150 hours using screw B

Rotor bearings, supports

All the machine bearings are pre lubricated for life and no greasing is necessary

Automatic turnbuckle

to be greased every 8 working hours

Roller bearing

this bearings are to be greased every 8 working hours

PTO shaft joint

Grease the following evertu 8 working hours:

the cross journal A

the tubes B

the sliding spacer elements C

oil the masks D every 120 working hours

Automatic belt turnbuckle

If necessary the spring tension must be insreased by means of lever A (Fig.19)

Check the spring tension:

after the first ½ hour of work

after the first 8 working hours

every 20 working hours

Cutters

Check daily that thereare no broken cutters.
If there are, replace it with the one diametrically opposite, in order to maintain a correct tractor balance.

Do not wait until the cutters are excessively worn before replacing, as it causes:

morepower to be used

vibrations thatare detrimental to the rotating parts of the shredder

ROERO - TST

________________________________________________________________________________

20

Counter-cutter

Regularly check its condition and clean, especially when the vegetation is damp.

Storage

Before storing the machine:

wash it thoroughly

check the parts subject to wear (cutters, belts)

spray a fine film of oil or diesel over the entire machine to protect it against rust

Going into the road

1.

before beginning work check all the nuts and bolts and then again after the first 50 working hours

2.

correctly connect the machine to the tyractor

3.

check that the PTO running speed is at 540 or 1000 rpm

4.

insert the PTO with a slow running speed, with the wheels resting on the ground and the machine horizontal

5.

go freward by a few metres and check the cutting height. adjust if necessary

Warning!

All the greasing, lubrication, maintenance, repair, parts substitution, setting onto the road operations must be carried out slowly
with the greatest care in compliance with the safetu regulations of this manual. failire to respect event one of these regulations
may cause seroius injury or death to the operator or the accompanying personnel.

Warranty

The company OMARV SRL warrants for 12 months from the date of delivery of new machine of his own making.

The warranty does not cover PTO shaft, blades, bearings and belts. These parts are warranted by the respective manufacturer.
During the months of warranty OMARV SRL is committed to provide free part found defective by its technical department but are
charged to the customer all freight, packaging and labour. Changes made by the client on the machine, use different from that stated in
the manual for use and handling, carelessness of the user and the use of parts not manufactured, voids the warranty.

OMARV SRL disclaims all liability for damages suffered by the client because of the breakdown of the machine or its part, delayed
delivery, as well as because of the use of the machine itself. For technical and administrative reasons, all parts will be charged at time of
shipment. The acceptance of any warranty claim and the right credit will take place upon receipt and verification of the defective part.
For all the controversy jurisdiction is one of Asti, Italy.

Summary of Contents for ROERO TST 120

Page 1: ...e and should accompany it until its demolition In the event of its loss or damage it will be necessary to request a substitute copy from the OMARV S R L The technical information contained in this man...

Page 2: ...EN 745 UNI EN 1553 And also the technical specification ISO 11684 Castagnole delle Lanze Legal representative _________________________ GEO ITALY SRL Reg S Andrea 1 14025 Montechiaro d Asti AT Tel 39...

Page 3: ...35 150 165 180 200 SIZE WORK m 1 20 1 35 1 50 1 65 1 80 2 00 TOTAL SIZE m 1 32 1 47 1 62 1 77 1 92 2 12 WEIGHT Kg 240 280 325 370 415 430 POWER REQUIRED HP 35 40 45 50 60 70 N HAMMER KNIFE 10 20 12 24...

Page 4: ...ne e t th he er re eb by y c ca an nc ce el ll li in ng g t th hi is s c ce er rt ti if fi ic ca at ti io on n A An ny y m mo od di if fi ic ca at ti io on n s sh ho ou ul ld d b be e m ma ad de e e e...

Page 5: ...ju ur ry y o or r d de ea at th h t to o t th he e o op pe er ra at to or r I If f t th hi is s s sh ho ou ul ld d h ha ap pp pe en n d do o n no ot t r re em ma ai in n i in n t th he e v vi ic ci i...

Page 6: ...he hoist bars with chains and parallel tightness You have to do this in order to avoid any horizontal displacements of the machine 5 Fix the upper connection of the brush shredder to the third point o...

Page 7: ...eed of the tractor ROERO TST ________________________________________________________________________________ 14 Choice of blades The ROERO mower and gathering basket are equipe with shovel blades tha...

Page 8: ...se a rapid deterioration of the rotor and cause vibrations Any discrepancy must be rectified immediately otherwise the safety conditions of the operator and the machine may be placed in jeopardy In or...

Page 9: ...for corn hay rape S ROERO TST ________________________________________________________________________________ 18 Rotor checks It is necessary to check the presence and efficiency of all the cutters o...

Page 10: ...oad 1 before beginning work check all the nuts and bolts and then again after the first 50 working hours 2 correctly connect the machine to the tyractor 3 check that the PTO running speed is at 540 or...

Page 11: ...ST ________________________________________________________________________________ 21 FIX ROERO ROERO TST ________________________________________________________________________________ 22 HYDRAULIC...

Page 12: ...Aggiornamento 01 Giugno 2008 1di3...

Page 13: ......

Page 14: ...Aggiornamento 01 Giugno 2008 1di3...

Page 15: ...3 4 5 6 5 3 4 2 5 6 5 0 7 1 890 1 890 890 890 8 1 09 2 3 1 09 0 7 1 890 1 890 5 5 5 5 2 0 AB 0 0 AB 2 0 7 1 890 1 890 2 0 1 890 70 1 890 70 2 0 7 1 890 1 890 A 09 C 09 1 890 9 1 890 D 890 890 2 7 2 2...

Page 16: ...Aggiornamento 01 Giugno 2008 1di3...

Page 17: ...EEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 2 890 890 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 2 8...

Page 18: ...Aggiornamento 01 Giugno 2008 3di3...

Page 19: ...EEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE 0 5 8 70 1 5 09 0 1 5 09 F A A 2 0 1 2 1 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEEE 1...

Page 20: ...Aggiornamento 01 Giugno 2008 3di3...

Page 21: ...EEE 1 G G G G 1 H H H H B 0 7 1 1 8 1 09 2 3 1 09 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 1 G G G G 1 H H H H B 0 7 1 1 8 1 09 2 3 1 09 EEEE...

Page 22: ...Aggiornamento 01 Giugno 2008 2di3...

Page 23: ...EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE 8 1 09 2 3 1 09 890 890 0 7 1 890 1 890 I 0 7 1 890 1 890 890 890 C 2 8 C C C 2 C J K 2 J K C J K 2 J K C J K 2 J K C J K 2 J...

Page 24: ...Aggiornamento 01 Giugno 2008 2di3...

Page 25: ...J K 2 L J K 9 C L J K 2 L J K 9 C L J K 2 L J K 9 C L J K 2 L J2 K 9 C L J K 2 L J2 K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J2 K L J K L J2 K F F F F F F F A 3 1 9 2 A 3...

Page 26: ...Aggiornamento 01 Giugno 2008 2di3...

Reviews: