background image

ROERO - TST

________________________________________________________________________________

13

Operation

Arrived in the area where you want to give up, lower the machine. The machine must be perfectly horizontal to the ground, lying on the
rear roller.

Warning!

The knives must not be in contact with the ground.

Never lower the machine less than 3 cm from the ground.

The quality of the work and the power required depend on:

The type of product to be shredded and its humidity

The type of blades used

The height of the work

The advancing speed of the tractor

ROERO - TST

________________________________________________________________________________

14

Choice of blades

The ROERO mower and gathering basket are equipe with shovel blades that offer the best cutting quality and ventilation. These shovel
blades are ideal for uncultivated terrain, grass, beet or carrot leaves. As an option “Y” shaped blades are provided for maize, straw and
rape.

Beware!

Use only original OMARV blades.

Warning!

Before starting any job you should warm up the tractor engine and the hydraulic oil for a few minutes in orer to guarantee a
quick response from the hydraulic parts..

Warning!

During shredding work make sure that there are no people or animals inside the radius of the action of the machine.

Summary of Contents for ROERO TST 120

Page 1: ...e and should accompany it until its demolition In the event of its loss or damage it will be necessary to request a substitute copy from the OMARV S R L The technical information contained in this man...

Page 2: ...EN 745 UNI EN 1553 And also the technical specification ISO 11684 Castagnole delle Lanze Legal representative _________________________ GEO ITALY SRL Reg S Andrea 1 14025 Montechiaro d Asti AT Tel 39...

Page 3: ...35 150 165 180 200 SIZE WORK m 1 20 1 35 1 50 1 65 1 80 2 00 TOTAL SIZE m 1 32 1 47 1 62 1 77 1 92 2 12 WEIGHT Kg 240 280 325 370 415 430 POWER REQUIRED HP 35 40 45 50 60 70 N HAMMER KNIFE 10 20 12 24...

Page 4: ...ne e t th he er re eb by y c ca an nc ce el ll li in ng g t th hi is s c ce er rt ti if fi ic ca at ti io on n A An ny y m mo od di if fi ic ca at ti io on n s sh ho ou ul ld d b be e m ma ad de e e e...

Page 5: ...ju ur ry y o or r d de ea at th h t to o t th he e o op pe er ra at to or r I If f t th hi is s s sh ho ou ul ld d h ha ap pp pe en n d do o n no ot t r re em ma ai in n i in n t th he e v vi ic ci i...

Page 6: ...he hoist bars with chains and parallel tightness You have to do this in order to avoid any horizontal displacements of the machine 5 Fix the upper connection of the brush shredder to the third point o...

Page 7: ...eed of the tractor ROERO TST ________________________________________________________________________________ 14 Choice of blades The ROERO mower and gathering basket are equipe with shovel blades tha...

Page 8: ...se a rapid deterioration of the rotor and cause vibrations Any discrepancy must be rectified immediately otherwise the safety conditions of the operator and the machine may be placed in jeopardy In or...

Page 9: ...for corn hay rape S ROERO TST ________________________________________________________________________________ 18 Rotor checks It is necessary to check the presence and efficiency of all the cutters o...

Page 10: ...oad 1 before beginning work check all the nuts and bolts and then again after the first 50 working hours 2 correctly connect the machine to the tyractor 3 check that the PTO running speed is at 540 or...

Page 11: ...ST ________________________________________________________________________________ 21 FIX ROERO ROERO TST ________________________________________________________________________________ 22 HYDRAULIC...

Page 12: ...Aggiornamento 01 Giugno 2008 1di3...

Page 13: ......

Page 14: ...Aggiornamento 01 Giugno 2008 1di3...

Page 15: ...3 4 5 6 5 3 4 2 5 6 5 0 7 1 890 1 890 890 890 8 1 09 2 3 1 09 0 7 1 890 1 890 5 5 5 5 2 0 AB 0 0 AB 2 0 7 1 890 1 890 2 0 1 890 70 1 890 70 2 0 7 1 890 1 890 A 09 C 09 1 890 9 1 890 D 890 890 2 7 2 2...

Page 16: ...Aggiornamento 01 Giugno 2008 1di3...

Page 17: ...EEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 2 890 890 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 2 8...

Page 18: ...Aggiornamento 01 Giugno 2008 3di3...

Page 19: ...EEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE 0 5 8 70 1 5 09 0 1 5 09 F A A 2 0 1 2 1 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEEE 1...

Page 20: ...Aggiornamento 01 Giugno 2008 3di3...

Page 21: ...EEE 1 G G G G 1 H H H H B 0 7 1 1 8 1 09 2 3 1 09 EEEEEEEEEE EEEEEEEEEEEEEEEEE EEEEEEEEEE 1A 7 A EEEEEEEEEEEEEEEEEEEEEE 1A 7 EEEEEEEEEEEEEEEEEEEEEEEE 1 G G G G 1 H H H H B 0 7 1 1 8 1 09 2 3 1 09 EEEE...

Page 22: ...Aggiornamento 01 Giugno 2008 2di3...

Page 23: ...EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE 8 1 09 2 3 1 09 890 890 0 7 1 890 1 890 I 0 7 1 890 1 890 890 890 C 2 8 C C C 2 C J K 2 J K C J K 2 J K C J K 2 J K C J K 2 J...

Page 24: ...Aggiornamento 01 Giugno 2008 2di3...

Page 25: ...J K 2 L J K 9 C L J K 2 L J K 9 C L J K 2 L J K 9 C L J K 2 L J2 K 9 C L J K 2 L J2 K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J K L J2 K L J K L J2 K F F F F F F F A 3 1 9 2 A 3...

Page 26: ...Aggiornamento 01 Giugno 2008 2di3...

Reviews: