2.
When correctly positioned, attach each Joist with
4 - 2 1/2” screws
(2 per end).
Complete all Floor Frame and Joist connections.
You can find the Square Drive Bit for the screws
in with the Hardware Kit Bag.
3.
Lay out 66 1/2” and 75” long
Floor Joist Frames
and attach together with
6 - 2 1/2” screws
. Complete
all Long and Short Floor Frames now. (3 in total).
4.
Now attach each completed section together
with
16 - 2 1/2” screws
as illustrated above.
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
5.
When completed, your floor footprint
should be 136 1/2” deep x 141 1/2” wide.
141 1/2”
136 1/2”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8